This paper briefly describes the various maintenance techniques carried out on the French PWR steam generators. The major applications have arisen due to the occurrence of primary side stress corrosion cracking problems at various transition regions of the Inconel 600 tubing. Reference is also made to several other applications not directly concerned with the tubing.