Local Authorities Challenges in the Implementation of Maintenance and Operation Blueprint

被引:0
|
作者
Norhidayah, M. Y. [1 ]
Khadijah, H. [1 ]
Maryanti, M. R. [1 ]
Ainur Zaireen, Z. [1 ]
Maslinda, A. L. [1 ]
Razali, M. N. [1 ]
Noorsidi Aizuddin, M. N. [1 ]
Abdul Hakim, M. [1 ]
Siti Radiaton Adawiyah, Z. [1 ]
机构
[1] Univ Teknol Malaysia, Fac Geoinformat & Real Estate, Dept Real Estate, Johor Baharu 81310, Johor, Malaysia
来源
JURNAL TEKNOLOGI | 2015年 / 73卷 / 05期
关键词
Critical success factors; immovable asset; maintenance management; blueprint and local authority;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Maintenance and Operation Blueprint for Iskandar Malaysia was established to ensure local authority immovable asset maintenance management is in line with Government Asset Management Policy 2009. This paper deals with investigation on the challenges in the implementation of Maintenance and Operation Blueprint Plan for Iskandar Malaysia among five local authorities in Iskandar Malaysia. A total of 25 respondents have been selected and interviewed. The data have been analyzed qualitatively. Base on the interview, the results show that there are challenges to implement maintenance and operation blueprint in local authority immovable asset maintenance management which are no clear direction from the top management to implement the Maintenance and Operation Blueprint for Iskandar Malaysia, lack of staff to implement the Maintenance and Operation Blueprint for Iskandar Malaysia, did not have enough time to implement the Maintenance and Operation Blueprint for Iskandar Malaysia and the high cost required to implement the Maintenance and Operation Blueprint for Iskandar Malaysia. This article can serve as a foundation for future studies in critical success factors to implement immovable asset maintenance and operation blueprint. A future study investigating critical success factors to implement immovable asset maintenance and operation blueprint would be very interesting to produce a new approach for successful blueprint implementation.
引用
收藏
页数:7
相关论文
共 50 条
  • [31] A HIERARCHICAL MODEL FOR E-LEARNING IMPLEMENTATION CHALLENGES USING AHP
    Farid, Shahid
    Ahmad, Rodina
    Alam, Mujahid
    MALAYSIAN JOURNAL OF COMPUTER SCIENCE, 2015, 28 (03) : 166 - 188
  • [32] Application of Principle Component Analysis and logistic regression to support Six Sigma implementation in maintenance
    Antosz, Katarzyna
    Jasiulewicz-Kaczmarek, Malgorzata
    Machado, Jose
    Relich, Marcin
    EKSPLOATACJA I NIEZAWODNOSC-MAINTENANCE AND RELIABILITY, 2023, 25 (04):
  • [33] Systematic review of predictive maintenance and digital twin technologies challenges, opportunities, and best practices
    Wahab, Nur Haninie Abd
    Hasikin, Khairunnisa
    Lai, Khin Wee
    Xia, Kaijian
    Bei, Lulu
    Huang, Kai
    Wu, Xiang
    PEERJ COMPUTER SCIENCE, 2024, 10
  • [34] Systematic review of predictive maintenance and digital twin technologies challenges, opportunities, and best practices
    Wahab N.H.A.
    Hasikin K.
    Lai K.W.
    Xia K.
    Bei L.
    Huang K.
    Wu X.
    PeerJ Computer Science, 2024, 10
  • [35] Enterprise Resource Planning (ERP) systems implementation challenges: A Kenyan case study
    Otieno, Jim Odhiambo
    BUSINESS INFORMATION SYSTEMS, 2008, 7 : 399 - 409
  • [36] Interdependence analysis of lean-green implementation challenges: a case of Indian SMEs
    Thanki, Shashank J.
    Thakkar, Jitesh
    JOURNAL OF MANUFACTURING TECHNOLOGY MANAGEMENT, 2018, 29 (02) : 295 - 328
  • [37] Strategies and success factors for overcoming challenges in JIT implementation in Indian manufacturing industry
    Singh, Gurinder
    Ahuja, Inderpreet Singh
    International Journal of Technology, Policy and Management, 2013, 13 (01) : 15 - 33
  • [38] Augmented reality in support of Industry 4.0-Implementation challenges and success factors
    Masood, Tariq
    Egger, Johannes
    ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 2019, 58 (181-195) : 181 - 195
  • [39] Strategies and success factors for overcoming challenges in TPM implementation in Indian manufacturing industry
    Ahuja, I. P. S.
    Khamba, J. S.
    JOURNAL OF QUALITY IN MAINTENANCE ENGINEERING, 2008, 14 (02) : 123 - +
  • [40] Study on Train Management Strategies with Respect to Research and Development, Operation and Maintenance from Integration of Locomotives with Vehicles
    Qian M.
    Tiedao Xuebao/Journal of the China Railway Society, 2023, 45 (10): : 1 - 8