共 25 条
[2]
BAAR T, 1998, METAHEURISTICS ADV T, P1
[3]
Bahreininejad A., 1997, NEURAL COMPUTATION S, P90
[5]
BELL CE, 1991, NAV RES LOG, V38, P315, DOI 10.1002/1520-6750(199106)38:3<315::AID-NAV3220380304>3.0.CO
[6]
2-7
[8]
BOULEIMEN K, 1998, P 6 INT WORKSH PROJ, P19
[9]
Construction resource scheduling with genetic algorithms
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
1996, 122 (02)
:125-132
[10]
COMPARISON OF HEURISTIC AND OPTIMUM SOLUTIONS IN RESOURCE-CONSTRAINED PROJECT SCHEDULING
[J].
MANAGEMENT SCIENCE SERIES B-APPLICATION,
1975, 21 (08)
:944-955