Technical risk factors of international construction

被引:5
作者
Martin, Asare [1 ]
Wang, Yousong [1 ]
Li, Jianfeng [1 ]
Mends, George [2 ]
机构
[1] South China Univ Technol, Civil & Transportat Engn, Guangzhou, Guangdong, Peoples R China
[2] North Cent Univ, Sch Business & Technol Management, Prescott Valley, AZ USA
来源
JOURNAL OF ENGINEERING-JOE | 2018年 / 2018卷 / 03期
关键词
D O I
10.1049/joe.2016.0389
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Construction is one of the strongholds for development in every country. The objective of the research is to identify the critical technical risk factors encountered by engineering firms on the global milieu. Based on questionnaire surveys, statistical analyses and previous studies on risk management, 23 risks were selected and ranked as technical factors that hinder construction projects. The relative importance index (RII) was used to determine the rank of each factor surveyed. The study revealed that industrial disputes, shortage in power supply, shortage in supply of water and problems of partner difference practice of construction globally were among the highly ranked technical risks. The study is beneficial as it adopts case studies in Africa to elicit the technical effects on the international frontlines. With the ranking of the technical risk factors, international construction firms can adequately enhance critical planning, avoid casualties and engage in economically viable projects. The study will be useful for analysing and investigating the hypothesised relationships technical risk variables that influence performance of international joint ventures. The risk factors displayed in the study can be used in supporting data for many other research development studies in the area of construction, risk analysis and global construction development studies.
引用
收藏
页码:138 / 146
页数:9
相关论文
共 29 条
[1]  
Abdullah, 2009, J ENG APPL SCI, V4, P170
[2]  
Akintoye AS., 1997, INT J PROJ MANAGE, V15, P31, DOI DOI 10.1016/S0263-7863(96)00035-X
[3]  
Al- Dubaisi A. H., 2000, THESIS
[4]  
Al-Momani AH., 2000, INT J PROJ MANAG, V18, P51
[5]   Causes, Effects, Benefits, and Remedies of Change Orders on Public Construction Projects in Oman [J].
Alnuaimi, Ali S. ;
Taha, Ramzi A. ;
Al Mohsin, Mohammed ;
Al-Harthi, Ali S. .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2010, 136 (05) :615-622
[6]  
[Anonymous], 2011, KUWAIT CHAPTER ARABI
[7]  
Asare Martin Henry, 2013, P 17 INT S ADV CONST, P743
[8]   FACTORS AFFECTING THE PERFORMANCE OF CONSTRUCTION PROJECTS IN THE GAZA STRIP [J].
Enshassi, Adnan ;
Mohamed, Sherif ;
Abushaban, Saleh .
JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2009, 15 (03) :269-280
[9]  
Finn Janet L., 2008, JUST PRACTICE SOCIAL, V2nd
[10]  
Fowler FJ., 2013, SURV RES METHODS-GER