The assessment of bidding strategy of Iranian construction firm

被引:12
作者
Banki, M. T. [1 ]
Esmaeeli, B. [1 ]
Ravanshadnia, M. [1 ]
机构
[1] Amirkabir Univ Technol, Dept Civil & Environm Engn, Tehran, Iran
关键词
bidding strategy; statistical analysis and number of bidders;
D O I
10.1080/17509653.2009.10671070
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
Arriving at the final bid price is a critical decision which is mostly done through experience and intuitions. As, many factors affect the final proposed price, no quantified decision processes may lead to irrational low or high proposed prices. Therefore, various attempts have been done to propose systematic models to track and analyze the bidding trends. This paper focuses on the previous trends of the bidding prices to estimate proper bidding cost in the Iranian construction industry The prices might be influenced by external characteristics such as competitors' policies, the number of tendered projects, the number of contractors competing in the current tender, project characteristics, and the client. The subject of bidding price can be investigated through the client view or the contractor view. This paper attends the second approach. This paper present a quantitative analysis of impact of number of bidders on project bid prices. The study found that increasing the number of bidders will result in decreased project bid prices.
引用
收藏
页码:153 / 160
页数:8
相关论文
共 16 条
  • [1] Ahmad I., 1987, P 18 ANN PITTSB C MO, V18, P367
  • [2] Drew D., 1997, CONSTRUCTION MANAGE, V15, P469
  • [3] A survey of the bidding practices of Canadian civil engineering construction contractors
    Fayek, A
    Ghoshal, I
    AbouRizk, S
    [J]. CANADIAN JOURNAL OF CIVIL ENGINEERING, 1999, 26 (01) : 13 - 25
  • [4] Competitive bidding strategy model and software system for bid preparation
    Fayek, A
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1998, 124 (01): : 1 - 10
  • [5] Fayek A., 1998, ENG MANAG J, V10, P29
  • [6] A COMPETITIVE-BIDDING STRATEGY
    FRIEDMAN, L
    [J]. OPERATIONS RESEARCH, 1956, 4 (01) : 104 - 112
  • [7] Gates M., 1967, J CONSTRUCTION DIVIS, V93, P74
  • [8] Bidding considerations in developing countries
    Jaselskis, EJ
    Talukhaba, A
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1998, 124 (03): : 185 - 193
  • [9] Lewis, 1998, P 14 ANN ARCOM C, V2, P535
  • [10] ANN-based mark-up estimation system with self-explanatory capacities
    Li, H
    Shen, LY
    Love, PED
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 1999, 125 (03) : 185 - 189