A hybrid flow shop model for an ice cream production scheduling problem

被引:2
作者
Vila, Imma Ribas [1 ]
Pascual, Ramon Companys [1 ]
机构
[1] Univ Politecn Cataluna, Barcelona, Spain
来源
JOURNAL OF INDUSTRIAL ENGINEERING AND MANAGEMENT-JIEM | 2009年 / 2卷 / 01期
关键词
scheduling; hybrid flow shop; mathematical programming; heuristics;
D O I
10.3926/jiem.2009.v2n1.p60-89
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this paper we address the scheduling problem that comes from an ice cream manufacturing company. This production system can be modelled as a three stage nowait hybrid flow shop with batch dependent setup costs. To contribute reducing the gap between theory and practice we have considered the real constraints and the criteria used by planners. The problem considered has been formulated as a mixed integer programming. Further, two competitive heuristic procedures have been developed and one of them will be proposed to schedule in the ice cream factory.
引用
收藏
页码:60 / 89
页数:30
相关论文
共 20 条