共 14 条
[1]
Benton W.C., 1982, J OPER MANAG, V2, P137
[2]
Berry W. L., 1972, PRODUCTION INVENTORY, V13, P19
[3]
BLACKBURN JD, 1979, PROD INV MGMT, V20, P41
[4]
CALLARMAN TE, 1981, J PURCHASING MAT MAN, V17, P25
[5]
Gaither N., 1981, Production and Inventory Management, V22, P75
[6]
Groff G.K., 1979, PROD INVENTORY MANAG, V1, P47
[7]
HEMPHILL AD, 1977, 96 IND U SCH BUS DIS
[8]
MCLAREN BJ, 1977, THESIS PURDUE U
[9]
SILVER EA, 1973, PRODUCTION INVENTORY, V14, P64
[10]
A COMPARISON OF DISCRETE, SINGLE STAGE LOT-SIZING HEURISTICS WITH SPECIAL EMPHASIS ON RULES BASED ON THE MARGINAL COST PRINCIPLE
[J].
ENGINEERING COSTS AND PRODUCTION ECONOMICS,
1982, 7 (01)
:45-53