INTERSTAGE TRANSPORTATION-PLANNING IN THE DETERMINISTIC FLOWSHOP ENVIRONMENT

被引:45
作者
LANGSTON, MA
机构
关键词
D O I
10.1287/opre.35.4.556
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
引用
收藏
页码:556 / 564
页数:9
相关论文
共 16 条
[1]  
Baker K., 1974, INTRO SEQUENCING SCH
[2]  
Buten R. E., 1973, Proceedings of the 1973 Sagamore Computer Conference on Parallel Processing, P130
[3]   SEQUENCING PROBLEMS IN 2-SERVER SYSTEMS [J].
CALDERBANK, AR ;
COFFMAN, EG ;
FLATTO, L .
MATHEMATICS OF OPERATIONS RESEARCH, 1985, 10 (04) :585-598
[4]  
Coffman Jr E. G., 1973, OPERATING SYSTEMS TH
[5]  
Conway R, 1967, THEORY SCHEDULING
[6]  
Garey Michael R., 1979, COMPUTERS INTRACTABI
[7]  
GONZALEZ MJ, 1977, COMPUT SURV, V9, P173, DOI 10.1145/356698.356700
[8]   BOUNDS ON MULTIPROCESSING TIMING ANOMALIES [J].
GRAHAM, RL .
SIAM JOURNAL ON APPLIED MATHEMATICS, 1969, 17 (02) :416-&
[9]  
Johnson S. M., 1954, NAV RES LOGIST Q, DOI [10.1002/nav.3800010110, DOI 10.1002/NAV.3800010110]
[10]   SEGREGATING THE INPUT TO A SERIES OF BUFFERS [J].
KELLY, FP .
MATHEMATICS OF OPERATIONS RESEARCH, 1985, 10 (01) :33-43