A bicriteria integer programming model for the hierarchical workforce scheduling problem

被引:10
|
作者
Pastor, Rafael [1 ]
Corominas, Albert [1 ]
机构
[1] Tech Univ Catalonia, IOC Inst Ind & Control Engn, Barcelona, Spain
关键词
Human resource management; Manpower planning; Employees;
D O I
10.1108/17465661011026167
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Purpose - The purpose of this paper is to propose a bicriteria integer programming model for hierarchical workforce scheduling in which the first criterion is the cost and the second is the suitability of task assignment to individual employees. The model is based on the integer programming formulation for the hierarchical workforce scheduling problem published in 2007 by Sec, kiner et al., which extends the model proposed by Billionnet in 1999. Design/methodology/approach - The principal hypothesis of this paper is that, although an employee is capable of performing several different tasks with equal efficiency, the type of task to which he/she is assigned affects the overall suitability of the assignment configuration. Therefore, cost-minimising solutions should also optimise task assignment when possible. This paper considers real cases and confirm that this approach to the problem is appropriate for dealing with common situations in personnel management. Findings - The proposed idea is applied to the example problem used by Sec, kiner et al. and the results are compared with Sec, kiner et al.'s model results. Originality/value - Consequently, the proposal is more general and a more faithful representation of the problems faced by personnel managers, which should help to bridge the gap between academic studies and practical cases.
引用
收藏
页码:54 / +
页数:10
相关论文
共 7 条
  • [1] A mixed-integer programming model for a single shift hierarchical employee scheduling problem
    Al-Yakoob, Salem M.
    KUWAIT JOURNAL OF SCIENCE & ENGINEERING, 2006, 33 (01): : 13 - 25
  • [2] An algorithm for single shift scheduling of hierarchical workforce
    Narasimhan, R
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1997, 96 (01) : 113 - 121
  • [3] Mixed Integer Programming to Schedule a Single-Shift Workforce under Annualized Hours
    Carlos S. Azmat
    Tony Hürlimann
    Marino Widmer
    Annals of Operations Research, 2004, 128 : 199 - 215
  • [4] Mixed integer programming to schedule a single-shift workforce under annualized hours
    Azmat, CS
    Hürlimann, T
    Widmer, M
    ANNALS OF OPERATIONS RESEARCH, 2004, 128 (1-4) : 199 - 215
  • [5] A Mixed-integer Multi-objective Maintenance and Production Workforce Planning Model
    Ighravwe D.E.
    Oke S.A.
    Process Integration and Optimization for Sustainability, 2017, 1 (4) : 251 - 267
  • [7] A Multi-objective Model for Multi-skill Project Scheduling Problem considering Perform Efficiency
    Zhu, Chong
    Xue, Yuan
    He, Zhijie
    Bao, Zhenqiang
    Zhang, Zhaoyue
    Hu, Kaixuan
    PROCEEDINGS OF THE 2019 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM 2019), 2019, : 719 - 724