CONTROLLING EQUIPMENT COSTS WITH TOTAL-COST BIDDING

被引:0
作者
HOYLE, EA
机构
来源
PUBLIC WORKS | 1985年 / 116卷 / 03期
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
引用
收藏
页码:73 / 74
页数:2
相关论文
共 50 条
[21]   TOTAL-COST - GREATER THAN ITS PART [J].
GRIECO, PL .
APICS 32ND INTERNATIONAL CONFERENCE PROCEEDINGS : SOLUTIONS FOR PROGRESS, 1989, :379-382
[22]   TOTAL-COST RECOVERY IN A UNIVERSITY PHOTOGRAPHIC DEPARTMENT [J].
LUND, RE .
JOURNAL OF AUDIOVISUAL MEDIA IN MEDICINE, 1981, 4 (01) :23-25
[23]   MINIMIZING TOTAL-COST IN SCHEDULING OUTPATIENT APPOINTMENTS [J].
HO, CJ ;
LAU, HS .
MANAGEMENT SCIENCE, 1992, 38 (12) :1750-1764
[24]   SYNTHETIC FUELS AND THE TOTAL-COST OF OIL IMPORTS [J].
LEE, BS .
COMBUSTION, 1981, 52 (07) :42-46
[25]   DECISION-PROCESSES WITH TOTAL-COST CRITERIA [J].
DEMKO, S ;
HILL, TP .
ANNALS OF PROBABILITY, 1981, 9 (02) :293-301
[26]   Seismic zoning for initial- and total-cost minimization [J].
García-Pérez, Jaime .
Earthquake Engineering and Structural Dynamics, 2000, 29 (06) :847-865
[27]   Controlling equipment costs with PSAs [J].
World Wastes, 1993, 36 (06)
[28]   SETUP REDUCTION - THE KEY TO QUALITY AND LOWEST TOTAL-COST [J].
STANG, PD .
APICS 34TH INTERNATIONAL CONFERENCE PROCEEDINGS: THE INTEGRATED MANAGEMENT REVOLUTION : A GLOBAL COMPETITIVE CHALLENGE, 1991, :528-529
[29]   Seismic zoning for initial- and total-cost minimization [J].
García-Pérez, J .
EARTHQUAKE ENGINEERING & STRUCTURAL DYNAMICS, 2000, 29 (06) :847-865
[30]   On the reduction of total-cost and average-cost MDPs to discounted MDPs [J].
Feinberg, Eugene A. ;
Huang, Jefferson .
NAVAL RESEARCH LOGISTICS, 2019, 66 (01) :38-56