Linear projects scheduling using spreadsheets features

被引:20
|
作者
Agrama, Fatma Abd El-Mohye [1 ]
机构
[1] Menoufia Univ, Dept Civil Engn, Al Minufiyah, Egypt
关键词
Construction management; Scheduling; Linear projects; Line of balance;
D O I
10.1016/j.aej.2011.01.018
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Linear projects represent a large portion of the construction industry. Highway, pipeline, and tunnels are good examples that exhibit repetitive characteristics where the same unit is repeated several times. Scheduling of linear projects always represent a major challenge to project managers. These projects require schedules that maintain resource continuity for an activity from one unit to the next one and achieve logic constraints at the same time. The line of balance (LOB) method is well suited for scheduling such projects. Spreadsheets are efficient computational tool used in many field with wide range of calculations. The requirements associated; within logical lag between continuous non-typical repeated activities are developed in a spreadsheet algorithm. In this study, the schedule times for each activity sequentially from unit to the next can be tabulated and graphically displayed in LOB plot. Details of the model development and computerized implementation are described. An example application is presented to illustrate the proposed approach. The advantages and future extensions of the proposed approach are then discussed. (C) 2011 Faculty of Engineering, Alexandria University. Production and hosting by Elsevier B.V. All rights reserved.
引用
收藏
页码:179 / 185
页数:7
相关论文
共 50 条
  • [1] Using Spreadsheets Features to Schedule Non-Identical Multi-Storey Building Projects
    Agrama, Fatma A.
    2015 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND OPERATIONS MANAGEMENT (IEOM), 2015,
  • [2] Optimized scheduling of linear projects
    Moselhi, O
    Hassanein, A
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2003, 129 (06) : 664 - 673
  • [3] SCHEDULING AND CONTROL OF LINEAR PROJECTS
    ELDIN, NN
    SENOUCI, AB
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 1994, 21 (02) : 219 - 230
  • [4] Multiobjective linear programming model for scheduling linear repetitive projects
    Ipsilandis, Pandelis G.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2007, 133 (06) : 417 - 424
  • [5] Scheduling of linear projects with single loop structures
    Eldin, NN
    Senouci, AB
    ADVANCES IN ENGINEERING SOFTWARE, 2000, 31 (10) : 803 - 814
  • [6] CREW SIZE SELECTION IN SCHEDULING LINEAR PROJECTS
    PANAGIOTAKOPOULOS, D
    CIVIL ENGINEERING FOR PRACTICING AND DESIGN ENGINEERS, 1982, 1 (03): : 223 - 240
  • [7] Fuzzy Linear and Repetitive Scheduling for Construction Projects
    Katsuragawa, Clara Mariana
    Lucko, Gunnar
    Isaac, Shabtai
    Su, Yi
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2021, 147 (03)
  • [8] Multiobjective linear program for scheduling repetitive projects
    King Fahd Univ of Petroleum and, Minerals, Dhahran, Saudi Arabia
    Cost Eng (Morgantown WVa), 12 (41-45):
  • [9] A linear control system simulation toolbox using spreadsheets
    El-Hajj, A
    Kabalan, KY
    Khoury, SV
    IEEE CONTROL SYSTEMS MAGAZINE, 2000, 20 (06): : 8 - 14
  • [10] Linear Equations and Spreadsheets
    School of Computing and Information Systems, University of Sunderland, St. Peter's Way, Sunderland
    SR60DD, United Kingdom
    Teaching Mathematics and its Applications, 1998, 17 (02): : 86 - 90