共 19 条
- [3] Brinkkotter W, 2001, J SCHED, V4, P53, DOI 10.1002/1099-1425(200101/02)4:1<53::AID-JOS59>3.0.CO
- [4] 2-Y
- [6] AN ALGORITHM FOR SOLVING THE JOB-SHOP PROBLEM [J]. MANAGEMENT SCIENCE, 1989, 35 (02) : 164 - 176
- [7] An improvement of the Lagrangean relaxation approach for job shop scheduling: A dynamic programming method [J]. IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, 1998, 14 (05): : 786 - 795
- [8] ALGORITHMS FOR SOLVING PRODUCTION-SCHEDULING PROBLEMS [J]. OPERATIONS RESEARCH, 1960, 8 (04) : 487 - 503
- [9] Herroelen W, 2004, INT J PROD RES, V42, P1599, DOI 10.1080/00207543310001638055
- [10] Kawata Y., 2003, International Journal of Manufacturing Technology and Management, V5, P1, DOI 10.1504/IJMTM.2003.002524