EUREKA - A HYBRID SYSTEM FOR ASSEMBLY LINE BALANCING

被引:101
|
作者
HOFFMANN, TR
机构
[1] Univ of Minnesota, Minneapolis, MN
关键词
LINE BALANCING; BRANCH AND BOUND; MICROCOMPUTER; HEURISTIC;
D O I
10.1287/mnsc.38.1.39
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Numerous methods have been proposed for solution of the simple assembly line balancing (SALB) problem. This paper describes a branch and bound algorithm which in many cases is faster than the well-known Hoffmann heuristic technique to which it is related. It introduces a simple bounding rule which uses the concept of the "theoretical" minimum slack time to achieve rapid solutions. It is combined with the Hoffmann heuristic to develop an even more effective system for solving SALB problems. Timing results are given for a standard set of problems found in the literature. Since that set was solved in such a very short time, more challenging as well as more typical problems are explored and timing results presented. Benchmarking of the procedure is easier since implementation is on an eight-megahertz IBM AT with a math coprocessor, using the standard IBM PC Professional FORTRAN compiler.
引用
收藏
页码:39 / 47
页数:9
相关论文
共 50 条
  • [11] Balancing assembly line with skilled and unskilled workers
    Corominas, Albert
    Pastor, Rafael
    Plans, Joan
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2008, 36 (06): : 1126 - 1132
  • [12] Modeling and Optimization of Assembly Line Balancing Type 2 and E (SLBP-2E) for a Reconfigurable Manufacturing System
    Khan, Abdul Salam
    Khan, Razaullah
    Saleem, Waqas
    Salah, Bashir
    Alkhatib, Soliman
    PROCESSES, 2022, 10 (08)
  • [13] Effects of step-by-step line balancing in apparel assembly line
    Kim, Minsuk
    Kim, Sungmin
    JOURNAL OF ENGINEERED FIBERS AND FABRICS, 2023, 18
  • [14] Stability measure for a generalized assembly line balancing problem
    Gurevsky, Evgeny
    Battaia, Olga
    Dolgui, Alexandre
    DISCRETE APPLIED MATHEMATICS, 2013, 161 (03) : 377 - 394
  • [15] Assembly line balancing the comparison of COMSOAL and MSNSH technique in Motorcycle manufacturing company
    Lerttira, Areeda
    Yarlagadda, Prasad K. D. V.
    ADVANCED DESIGNS AND RESEARCHES FOR MANUFACTURING, PTS 1-3, 2013, 605-607 : 166 - 174
  • [16] ASSEMBLY LINE BALANCING WITH RESOURCE DEPENDENT TASK TIMES
    FAALAND, BH
    KLASTORIN, TD
    SCHMITT, TG
    SHTUB, A
    DECISION SCIENCES, 1992, 23 (02) : 343 - 364
  • [17] Research on assembly line balancing based on electronic products
    Ling, Zhao
    PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON MECHATRONICS, ELECTRONIC, INDUSTRIAL AND CONTROL ENGINEERING, 2015, 8 : 1290 - 1293
  • [18] Optimization of assembly line balancing using genetic algorithm
    N.Barathwaj
    P.Raja
    S.Gokulraj
    JournalofCentralSouthUniversity, 2015, 22 (10) : 3957 - 3969
  • [19] Heuristics for the re-balancing of a vehicle assembly line
    Grangeon, Nathalie
    Leclaire, Patrice
    Norre, Sylvie
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2011, 49 (22) : 6609 - 6628
  • [20] A new bidirectional heuristic for the assembly line balancing problem
    Yeh, Din-Horng
    Kao, Hsiu-Hsueh
    COMPUTERS & INDUSTRIAL ENGINEERING, 2009, 57 (04) : 1155 - 1160