A framework to minimise total energy consumption and total tardiness on a single machine

被引:270
作者
Mouzon, Gilles [1 ]
Yildirim, Mehmet B. [1 ]
机构
[1] Wichita State Univ, Dept Ind & Mfg Engn, Wichita, KS 67260 USA
关键词
energy efficient production planning; sustainable/green manufacturing; multiobjective GRASP; single-machine scheduling;
D O I
10.1080/19397030802257236
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
A great amount of energy is wasted in industry by machines that remain idle due to underutilisation. A way to avoid wasting energy and thus reducing the carbon print of an industrial plant is to consider minimisation of energy consumption objective while making scheduling decisions. To minimise energy consumption, the decision maker has to decide the timing and length of turn off/turn on operation (a setup) and also provide a sequence of jobs that minimises the scheduling objective, assuming that all jobs are not available at the same time. In this paper, a framework to solve a multiobjective optimisation problem that minimises total energy consumption and total tardiness is proposed. Since total tardiness problem with release dates is an NP-hard problem, a new greedy randomised multiobjective adaptive search metaheuristic is utilised to obtain an approximate pareto front (i.e. an approximate set of non-dominated solutions). Analytical Hierarchy Process is utilised to determine the 'best' alternative among the solutions on the pareto front. The proposed framework is illustrated in a case study. It is shown that a wide variety of dispersed solutions can be obtained via the proposed framework, and as total tardiness decreases, total energy consumption increases.
引用
收藏
页码:105 / 116
页数:12
相关论文
共 22 条
[1]  
Aiex R. M., 2001, PARALLEL GRASP PATH
[2]   Grasp with memory-based mechanisms for minimizing total tardiness in single machine scheduling with setup times [J].
Armentano, Vinicius Amaral ;
Bassi de Araujo, Olinto Cesar .
JOURNAL OF HEURISTICS, 2006, 12 (06) :427-446
[3]  
BINATO S, 2000, GREEDY RANDOMIZED AD
[4]  
CHU CB, 1992, NAV RES LOG, V39, P265, DOI 10.1002/1520-6750(199203)39:2<265::AID-NAV3220390209>3.0.CO
[5]  
2-L
[6]  
Drake R., 2006, P 2006 I IND ENG RES
[7]   Multi-objective meta-heuristics: An overview of the current state-of-the-art [J].
Jones, DF ;
Mirrazavi, SK ;
Tamiz, M .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2002, 137 (01) :1-9
[8]   A SEARCH HEURISTIC FOR JUST-IN-TIME SCHEDULING IN PARALLEL MACHINES [J].
LAGUNA, M ;
VELARDE, JLG .
JOURNAL OF INTELLIGENT MANUFACTURING, 1991, 2 (04) :253-260
[9]  
Lenstra J., 1977, ANN DISCRETE MATH, V1, P343, DOI DOI 10.1016/S0167-5060(08)70743-X
[10]   Operational methods for minimization of energy consumption of manufacturing equipment [J].
Mouzon, Gilles ;
Yildirim, Mehmet B. ;
Twomey, Janet .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2007, 45 (18-19) :4247-4271