A CHANCE-CONSTRAINED FUZZY GOAL PROGRAM

被引:16
|
作者
MOHAMED, RH [1 ]
机构
[1] UNIV CAIRO,FAC ECON & POLIT SCI,CAIRO,EGYPT
关键词
GOAL PROGRAMMING; FUZZY SETS; CHANCE-CONSTRAINED GOAL PROGRAMMING; FUZZY GOAL PROGRAMMING;
D O I
10.1016/0165-0114(92)90176-5
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
A chance-constrained goal program in the case of having uncertain aspiration levels is considered. However these aspiration levels are random variables with known probability distribution functions. The goal constraints considered are probabilistic and fuzzy constraints. The equivalent deterministic goal program is developed and an illustrative example is given.
引用
收藏
页码:183 / 186
页数:4
相关论文
共 50 条
  • [41] Chance-constrained genetic algorithms
    Loughlin, DH
    Ranjithan, SR
    GECCO-99: PROCEEDINGS OF THE GENETIC AND EVOLUTIONARY COMPUTATION CONFERENCE, 1999, : 368 - 376
  • [42] Fuzzy chance-constrained geometric programming: the possibility, necessity and credibility approaches
    Shiraz, Rashed Khanjani
    Tavana, Madjid
    Fukuyama, Hirofumi
    Di Caprio, Debora
    OPERATIONAL RESEARCH, 2017, 17 (01) : 67 - 97
  • [43] Chance-constrained programming for fuzzy quadratic minimum spanning tree problem
    Gao, JW
    Lu, M
    Liu, LZ
    2004 IEEE INTERNATIONAL CONFERENCE ON FUZZY SYSTEMS, VOLS 1-3, PROCEEDINGS, 2004, : 983 - 987
  • [44] COTS products selection using fuzzy chance-constrained multiobjective programming
    Mehlawat, Mukesh Kumar
    Gupta, Pankaj
    APPLIED INTELLIGENCE, 2015, 43 (04) : 732 - 751
  • [45] A Scenario-Based Chance-Constrained Program for GasolineBlending under Uncertainty
    Wang, Cong
    Zhong, Weimin
    He, Renchu
    Peng, Xin
    Zhao, Liang
    INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2022, 61 (15) : 5215 - 5226
  • [46] Fuzzy random chance-constrained programming for quantifying the transmission reliability margin
    Wu, Jiekang
    Wu, Qiang
    Chen, Guotong
    Liang, Ying
    Zhou, Ju
    Dianli Xitong Zidonghua/Automation of Electric Power Systems, 2007, 31 (05): : 23 - 28
  • [47] Distributionally Robust Chance-constrained Program Surgery Planning with Downstream Resource
    Wang, Shanshan
    Li, Jinlin
    Peng, Chun
    2017 14TH INTERNATIONAL CONFERENCE ON SERVICES SYSTEMS AND SERVICES MANAGEMENT (ICSSSM), 2017,
  • [48] A fuzzy chance-constrained program for unit commitment problem considering demand response, electric vehicle and wind power
    Zhang, Ning
    Hu, Zhaoguang
    Han, Xue
    Zhang, Jian
    Zhou, Yuhui
    INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2015, 65 : 201 - 209
  • [49] Power System Day-Ahead Unit Commitment Based on Chance-Constrained Dependent Chance Goal Programming
    Li, Zhiwei
    Jin, Tianran
    Zhao, Shuqiang
    Liu, Jinshan
    ENERGIES, 2018, 11 (07):
  • [50] A Fuzzy Goal Programming Method for Solving Chance Constrained Programming with Fuzzy Parameters
    Biswas, Animesh
    Modak, Nilkanta
    CONTROL, COMPUTATION AND INFORMATION SYSTEMS, 2011, 140 : 187 - 196