共 50 条
- [21] LIFE EXTENSION OF STEAM-TURBINE ROTORS ON THE BASIS OF DESIGN REASSESSMENT RECENT ADVANCES IN DESIGN PROCEDURES FOR HIGH TEMPERATURE PLANT, 1988, : 27 - 36
- [23] SELECTION, ANALYSIS AND PRELIMINARY DESIGN OF A STEAM-LUBRICATED, STEAM-TURBINE, SHAFT SEAL ASLE TRANSACTIONS, 1971, 14 (03): : 226 - &
- [24] Design features and commissioning of first domestically-made heat recovery boiler and steam turbine in a 175 MW gas-steam combined cycle generating unit Zhongguo Dianli/Electric Power, 2002, 35 (11):
- [29] On effective rapid startup of 300 MW steam turbine unit PROCEEDINGS OF THE 32ND 2020 CHINESE CONTROL AND DECISION CONFERENCE (CCDC 2020), 2020, : 803 - 808
- [30] A DESIGN ANALYSIS OF STEAM-TURBINE BLADE ROOTS UNDER CENTRIFUGAL LOADING JOURNAL OF STRAIN ANALYSIS FOR ENGINEERING DESIGN, 1990, 25 (03): : 185 - 195