CHANGING AND IMPROVING EXISTING PLANTS TO MEET NEW REQUIREMENTS

被引:0
|
作者
FAY, GC [1 ]
机构
[1] HENDRYX ENGN INC,PITTSBURGH,PA 15200
来源
AMERICAN CERAMIC SOCIETY BULLETIN | 1975年 / 54卷 / 09期
关键词
D O I
暂无
中图分类号
TQ174 [陶瓷工业]; TB3 [工程材料学];
学科分类号
0805 ; 080502 ;
摘要
引用
收藏
页码:795 / &
相关论文
共 50 条
  • [31] The European EMC Directive - A comparison of existing and new requirements
    Jones, B
    2003 IEEE SYMPOSIUM ON ELECTROMAGNETIC COMPATIBILITY, SYMPOSIUM RECORD, VOLS 1 AND 2, 2003, : 97 - 101
  • [32] PROCESS SAFETY ASSESSMENT OF NEW AND EXISTING PLANTS
    PIKAAR, J
    BRAITHWAITE, J
    COX, T
    JOURNAL OF OCCUPATIONAL ACCIDENTS, 1990, 13 (1-2): : 103 - 110
  • [33] Simulation Method to Meet New Pass-By Noise Requirements
    Kim, Uije
    Maunder, Matthew
    Mawdsley, Duncan
    Grant, Phil
    SOUND AND VIBRATION, 2015, 49 (09) : 12 - 19
  • [34] Designing to meet requirements
    Barbera, B
    CONNECTOR SPECIFIER, 2001, 17 (03) : 30 - 30
  • [35] NEW PLUG AND SOCKET DESIGN - COULD IT MEET IEC REQUIREMENTS
    不详
    ELECTRICAL REVIEW, 1975, 197 (15): : 469 - 469
  • [36] Micro-cutting of steel to meet new requirements in miniaturization
    Weule, H
    Hüntrup, V
    Tritschler, H
    CIRP ANNALS-MANUFACTURING TECHNOLOGY, 2001, 50 (01): : 61 - 64
  • [37] NEW PREPARATION METHODS TO MEET FUTURE MARKET REQUIREMENTS.
    Bethe, Wolfgang-Peter
    Kubitza, Heinz
    Gluckauf. With English translation Essen, 1988, 124 (4-5): : 136 - 141
  • [38] Changing Pumps to Meet Changing System
    Brady, James M.
    Opflow, 2007, 33 (02) : 14 - 17
  • [39] PROBLEMS CONNECTED WITH COUPLING OF NEW, MODERN PLANTS WITH EXISTING PRODUCTION PLANTS
    KUNZE, P
    CHEMISCHE TECHNIK, 1978, 30 (01): : 13 - 16
  • [40] MODERNIZATION OF VENALUM POTS TO MEET NEW REQUIREMENTS AND HIGHER PERFORMANCE
    MEDINA, H
    ELARBA, N
    VIVAS, AM
    JOURNAL OF METALS, 1987, 39 (10): : A29 - A29