The effect of intervening conditions on the management of project risk

被引:8
作者
Kutsch, Elmar [1 ]
机构
[1] Cranfield Univ, Sch Management, Cranfield, Beds, England
关键词
Project management; Risk management;
D O I
10.1108/17538370810906282
中图分类号
F [经济];
学科分类号
02 ;
摘要
Purpose - The purpose of this paper is to highlight the main findings of a successfully defended doctoral thesis that studied factors or interventions causing the discrepancy between how adequate project risks should be managed and how project risks are actually managed. Design/methodology/approach - The approach involved interviews and a survey using questionnaires gathered data from project managers about their experiences with project risk management during two phases of fieldwork. The first phase included in-depth interviews with information technology (IT) project managers in order to explore patterns involving risk mediators and their influence on project risk management. A web-based survey was used in the second phase for the purpose of testing these patterns on a wider range of project managers. Findings - Specific risk-related interventions strongly influence the effective use of project risk management: project managers tended to deny, avoid, ignore risks and to delay the management of risk. Risks were perceived as discomforting, not agreed upon. IT project managers were unaware of risks and considered them to be outside their scope of influence and preferred to let risks resolve themselves rather than proactively engaging with them. As a consequence, factors such as the lack of awareness of risks by IT project managers appeared to constrain the application of project risk management with the result that risk had an adverse influence on the outcome of IT projects. Practical implications - The underlying rational assumptions of project risk management and the usefulness of best practice project risk management standards as a whole need to be questioned because of the occurrence of interventions such as the lack of information. IT project managers should first prevent risk-related interventions from influencing the use of project risk management. However, if this is not possible, they should be prepared to adapt to risks influencing the project outcome. Originality/value - The paper contradicts the myth of a "self-evidently" correct project risk management approach. It defines interventions that constrain project manager's ability to manage project risk.
引用
收藏
页码:602 / 610
页数:9
相关论文
共 32 条
[1]  
Anand P., 1993, ANAND
[2]  
[Anonymous], 1993, BUSINESS RISK MANAGE
[3]  
APM, 2005, PROJ MAN BOD KNOWL
[4]  
Ashill N. J., 2001, J MARKET MANAG, V17, P543, DOI [10.1362/026725701323366926, DOI 10.1362/026725701323366926]
[5]  
ASHILL NJ, 1999, J MARKETING MANAGEME, V15, P519
[6]   An integrative contingency model of software project risk management [J].
Barki, H ;
Rivard, S ;
Talbot, J .
JOURNAL OF MANAGEMENT INFORMATION SYSTEMS, 2001, 17 (04) :37-69
[7]   FLEXIBILITY AND THE THEORY OF THE FIRM [J].
CARLSSON, B .
INTERNATIONAL JOURNAL OF INDUSTRIAL ORGANIZATION, 1989, 7 (02) :179-203
[8]  
Chapman C., 1997, INT J PROJ MANAG, V15, P273, DOI DOI 10.1016/S0263-7863(96)00079-8
[10]   Uncertainty, flexibility, and sustained competitive advantage [J].
Dreyer, B ;
Gronhaug, K .
JOURNAL OF BUSINESS RESEARCH, 2004, 57 (05) :484-494