共 32 条
[2]
Al-Momani A.H., 2000, INT J PROJ MANAG, V18, P51, DOI DOI 10.1016/S0263-7863(98)00060-X
[4]
ALKHALIL MI, 1999, CONSTRUCTION MANAGEM, V17, P647, DOI DOI 10.1080/014461999371259
[5]
[Anonymous], 2010, 2010 SWC STADIUM COS
[6]
ANTILL JM, 1990, CRITICAL PATH METHOD
[8]
Ballong S., 2010, COST WORLD CUP
[9]
Bruzelius Nils., 2003, MEGAPROJECTS RISK
[10]
CIDB (Construction Industry Development Board), 2004, STAT REP SYNTH REV S