共 115 条
Recent research trend of economic-lot scheduling problems
被引:18
作者:
Chan, Hing Kai
[1
]
Chung, Sai Ho
[2
]
Lim, Ming K.
[3
]
机构:
[1] Univ East Anglia, Norwich Business Sch, Norwich, Norfolk, England
[2] Hong Kong Polytech Univ, Dept Ind & Syst Engn, Hong Kong, Hong Kong, Peoples R China
[3] Aston Univ, Dept Engn Syst & Management, Logist Management, Birmingham, W Midlands, England
关键词:
Economic-lot scheduling problem;
Scheduling;
Lot-sizing;
Review;
Production scheduling;
Operations management;
D O I:
10.1108/17410381311318936
中图分类号:
T [工业技术];
学科分类号:
08 ;
摘要:
Purpose - This research note aims to present a summary of research concerning economic-lot scheduling problem (ELSP). Design/methodology/approach - The paper's approach is to review over 100 selected studies published in the last 15 years (1997-2012), which are then grouped under different research themes. Findings - Five research themes are identified and insights for future studies are reported at the end of this paper. Research limitations/implications - The motivation of preparing this research note is to summarize key research studies in this field since 1997, when the ELSP problems have been verified as NP-hard. Originality/value - ELSP is an important scheduling problem that has been studied since the 1950s. Because of its complexity in delivering a feasible analytical closed form solution, many studies in the last two decades employed heuristic algorithms in order to come up with good and acceptable solutions. As a consequence, the solution approaches are quite diversified. The major contribution of this paper is to provide researchers who are interested in this area with a quick reference guide on the reviewed studies.
引用
收藏
页码:465 / 482
页数:18
相关论文