Recent research trend of economic-lot scheduling problems

被引:18
作者
Chan, Hing Kai [1 ]
Chung, Sai Ho [2 ]
Lim, Ming K. [3 ]
机构
[1] Univ East Anglia, Norwich Business Sch, Norwich, Norfolk, England
[2] Hong Kong Polytech Univ, Dept Ind & Syst Engn, Hong Kong, Hong Kong, Peoples R China
[3] Aston Univ, Dept Engn Syst & Management, Logist Management, Birmingham, W Midlands, England
关键词
Economic-lot scheduling problem; Scheduling; Lot-sizing; Review; Production scheduling; Operations management;
D O I
10.1108/17410381311318936
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose - This research note aims to present a summary of research concerning economic-lot scheduling problem (ELSP). Design/methodology/approach - The paper's approach is to review over 100 selected studies published in the last 15 years (1997-2012), which are then grouped under different research themes. Findings - Five research themes are identified and insights for future studies are reported at the end of this paper. Research limitations/implications - The motivation of preparing this research note is to summarize key research studies in this field since 1997, when the ELSP problems have been verified as NP-hard. Originality/value - ELSP is an important scheduling problem that has been studied since the 1950s. Because of its complexity in delivering a feasible analytical closed form solution, many studies in the last two decades employed heuristic algorithms in order to come up with good and acceptable solutions. As a consequence, the solution approaches are quite diversified. The major contribution of this paper is to provide researchers who are interested in this area with a quick reference guide on the reviewed studies.
引用
收藏
页码:465 / 482
页数:18
相关论文
共 115 条
[1]   Two metaheuristic methods for the common cycle economic lot sizing and scheduling in flexible flow shops with limited intermediate buffers: The finite horizon case [J].
Akrami, B. ;
Karimi, B. ;
Hosseini, S. M. Moattar .
APPLIED MATHEMATICS AND COMPUTATION, 2006, 183 (01) :634-645
[2]   The economic lot scheduling problem under performance decay [J].
Alle, A ;
Pinto, JM ;
Papageorgiou, LG .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2004, 43 (20) :6463-6475
[3]   Use of genetic algorithms to solve production and operations management problems: a review [J].
Aytug, H ;
Khouja, M ;
Vergara, FE .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2003, 41 (17) :3955-4009
[4]   Scheduling of an unreliable manufacturing system with nonresumable setups [J].
Bai, SX ;
Elhafsi, M .
COMPUTERS & INDUSTRIAL ENGINEERING, 1997, 32 (04) :909-925
[5]   Simultaneous determination of multiproduct batch and full truckload shipment schedules [J].
Banerjee, Avijit .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2009, 118 (01) :111-117
[6]   Economic lot scheduling problem with imperfect production processes [J].
Ben-Daya, M ;
Hariga, M .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2000, 51 (07) :875-881
[7]   Heuristics for the N-product, M-stage, economic lot sizing and scheduling problem with dynamic demand [J].
Boctor, FF ;
Poulin, P .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2005, 43 (13) :2809-2828
[8]   Single-stage resource allocation and economic lot scheduling on multiple, nonidentical production lines [J].
Bollapragada, R ;
Rao, U .
MANAGEMENT SCIENCE, 1999, 45 (06) :889-904
[9]  
BOMBERGER E, 1966, MANAGE SCI, V12, P778
[10]  
Bourland KE, 1997, IIE TRANS, V29, P417, DOI 10.1023/A:1018508304382