Performance measurement based on a total quality approach

被引:11
作者
Anvari, Farhad [1 ]
Edwards, Rodger [1 ]
机构
[1] Univ Manchester, Sch Mech Aerosp & Civil Engn, Manchester, Lancs, England
关键词
Effectiveness; Equipment; Total quality; Capital; Market; Steelmaking; Performance measurement (quality); Organizational effectiveness;
D O I
10.1108/17410401111140419
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Purpose - The steel industry is a capital-intensive industry and equipment utilisation as effectively as possible is of high priority. One of the key difficulties in the steel industry is the need to synchronise several processes to create a flow through every machine and plant. This paper aims to introduce the concept of integrated equipment effectiveness (IEE), which is a new approach for overall equipment effectiveness (OEE) measurement in three elements, consisting of "OEE loading-based", "OEE capital-based", and "OEE market-based" so as to meet these essential requirements. Design/methodology/approach - Based on a comprehensive scheme for loss analysis, the concept of integrated equipment effectiveness is developed. The case study is conducted in the factory of one large Asian steel-making company in order to examine the proposed model. Findings - The case study reveals the importance of the new scheme for loss analysis in a steel-making plant. IEE gives managers of steel plants a whole perspective on effectiveness. It also indicates the level of synchronisation of a specific machine for making steel within an entire organisation. Practical implications - IEE monitors the manufacturing process to utilise equipment effectively as much as possible and also measures equipment effectiveness for the full process cycle in order to respond to the market. IEE makes communication easier and more efficient. It provides a sound perspective on improvement in steel making and also can be used as a benchmark. Originality/value - The paper provides information on a new method for precise estimation of equipment effectiveness in a steel-making plant. It helps in optimising resource allocation and in improving strategic decision-making.
引用
收藏
页码:512 / 528
页数:17
相关论文
共 19 条
  • [1] Anvari F., Edwards R., Starr A., Integrated equipment effectiveness, 3rd World Congress on Engineering Asset Management (EAM) and The 5th International Conference on Condition Monitoring, Edinburgh, 15-18 July, pp. 56-64, (2008)
  • [2] Anvari F., Edwards R., Starr A., Evaluation of overall equipment effectiveness based on market, Journal of Quality in Maintenance Engineering, 16, 3, pp. 256-270, (2010)
  • [3] Appelqvist P., Lehtonen J.-M., Combining optimisation and simulation for steel production scheduling, Journal of Manufacturing Technology Management, 16, 2, pp. 197-210, (2005)
  • [4] Assaf I., Chen M., Katzberg J., Steel production schedule generation, International Journal of Production Research, 35, 2, pp. 467-477, (1997)
  • [5] Braglia M., Frosolini M., Zammori F., Overall equipment effectiveness of a manufacturing line (OEEML): An integrated approach to assess systems performance, Journal of Manufacturing Technology Management, 20, 1, pp. 8-29, (2009)
  • [6] de Ron A.J., Rooda J.E., Equipment effectiveness: OEE revisited, IEEE Transactions on Semiconductor Manufacturing, 18, 1, pp. 190-196, (2005)
  • [7] Gibbons P.M., Improving overall equipment efficiency using a Lean Six Sigma approach, International Journal of Six Sigma and Competitive Advantage, 2, 2, pp. 207-232, (2006)
  • [8] Hill T., Manufacturing Strategy - Text and Cases, (1994)
  • [9] Lee H.S., Murthy S.S., Primary production scheduling at steel-making industries, IBM Journal of Research & Development, 40, 2, pp. 231-253, (1996)
  • [10] Ljungberg O., Measurement of overall equipment effectiveness as a basic for TPM activities, International Journal of Operations & Production Management, 18, 5, pp. 495-507, (1998)