共 19 条
- [1] Anvari F., Edwards R., Starr A., Integrated equipment effectiveness, 3rd World Congress on Engineering Asset Management (EAM) and The 5th International Conference on Condition Monitoring, Edinburgh, 15-18 July, pp. 56-64, (2008)
- [2] Anvari F., Edwards R., Starr A., Evaluation of overall equipment effectiveness based on market, Journal of Quality in Maintenance Engineering, 16, 3, pp. 256-270, (2010)
- [3] Appelqvist P., Lehtonen J.-M., Combining optimisation and simulation for steel production scheduling, Journal of Manufacturing Technology Management, 16, 2, pp. 197-210, (2005)
- [4] Assaf I., Chen M., Katzberg J., Steel production schedule generation, International Journal of Production Research, 35, 2, pp. 467-477, (1997)
- [5] Braglia M., Frosolini M., Zammori F., Overall equipment effectiveness of a manufacturing line (OEEML): An integrated approach to assess systems performance, Journal of Manufacturing Technology Management, 20, 1, pp. 8-29, (2009)
- [6] de Ron A.J., Rooda J.E., Equipment effectiveness: OEE revisited, IEEE Transactions on Semiconductor Manufacturing, 18, 1, pp. 190-196, (2005)
- [7] Gibbons P.M., Improving overall equipment efficiency using a Lean Six Sigma approach, International Journal of Six Sigma and Competitive Advantage, 2, 2, pp. 207-232, (2006)
- [8] Hill T., Manufacturing Strategy - Text and Cases, (1994)
- [9] Lee H.S., Murthy S.S., Primary production scheduling at steel-making industries, IBM Journal of Research & Development, 40, 2, pp. 231-253, (1996)
- [10] Ljungberg O., Measurement of overall equipment effectiveness as a basic for TPM activities, International Journal of Operations & Production Management, 18, 5, pp. 495-507, (1998)