A SIMULATION GENERATOR FOR DUAL-CARD KANBAN-CONTROLLED FLOW SHOPS

被引:10
作者
CHRISTENSON, KR [1 ]
DOGAN, CA [1 ]
机构
[1] MICHIGAN TECHNOL UNIV,SCH BUSINESS & ENGN ADM,HOUGHTON,MI 49931
关键词
D O I
10.1080/00207549508904835
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper introduces a simulation generator for dual-card, kanban-controlled flow shops. Modelling kanban-controlled, pull manufacturing systems is a challenging task. The simulation generator eliminates modelling and the coding stages of simulation analysis and generates codes in SIMAN simulation language. An easy to use data-driven environment allows users to develop, edit, save and execute models without requiring any programming skills. The simulation generator is capable of simulating multi-product, multi-stage flow shops with multiple kanban cards (withdrawal and production order kanbans) and variable container sizes.
引用
收藏
页码:2615 / 2631
页数:17
相关论文
共 21 条
[11]  
Mejabi O., Wasserman G.S., Basic concepts of JIT modelling, International Journal of Production Research, 30, pp. 141-149, (1992)
[12]  
Mejabi O., Wasserman G.S., Simulation constructs for JIT modelling, International Journal of Production Research, 30, pp. 1119-1135, (1992)
[13]  
O'Keefe R.M., Und Haddock J., Data-driven gcncric simulators for flexible manufacturing systems, International Journal of Production Research, 29, pp. 1795-1810, (1991)
[14]  
Pegden C.D., Shannon R.E., Sadowski R.P., Introduction to Simulation Using SIM AN, (1990)
[15]  
Pidd M., Guidelines Tor the design of data-driven gcncric simulators for specific domains, Simulation, 59, pp. 237-243, (1992)
[16]  
Schonberger J Ans M.J., Topics in Just-In-Time Management, (1993)
[17]  
Schonberger R.J., Applications of single-card and dual-card kanban, Interfaces, 13, pp. 56-67, (1983)
[18]  
Schroer B.J., A simulation for modelling manufacturing systems, Simulation, 53, pp. 201-206, (1989)
[19]  
Schoer B.J., Black J.T., Zhang S.X., Just-in-time (JIT), with kanban, manufacturing system simulation on a microcomputer, Simulation, 45, pp. 62-70, (1985)
[20]  
Swtnehart K.D., Blackstone J.H., Simulating a JIT/kanban production system using GEMS, Simulation, 57, pp. 262-269, (1991)