共 21 条
[11]
Mejabi O., Wasserman G.S., Basic concepts of JIT modelling, International Journal of Production Research, 30, pp. 141-149, (1992)
[12]
Mejabi O., Wasserman G.S., Simulation constructs for JIT modelling, International Journal of Production Research, 30, pp. 1119-1135, (1992)
[13]
O'Keefe R.M., Und Haddock J., Data-driven gcncric simulators for flexible manufacturing systems, International Journal of Production Research, 29, pp. 1795-1810, (1991)
[14]
Pegden C.D., Shannon R.E., Sadowski R.P., Introduction to Simulation Using SIM AN, (1990)
[15]
Pidd M., Guidelines Tor the design of data-driven gcncric simulators for specific domains, Simulation, 59, pp. 237-243, (1992)
[16]
Schonberger J Ans M.J., Topics in Just-In-Time Management, (1993)
[17]
Schonberger R.J., Applications of single-card and dual-card kanban, Interfaces, 13, pp. 56-67, (1983)
[18]
Schroer B.J., A simulation for modelling manufacturing systems, Simulation, 53, pp. 201-206, (1989)
[19]
Schoer B.J., Black J.T., Zhang S.X., Just-in-time (JIT), with kanban, manufacturing system simulation on a microcomputer, Simulation, 45, pp. 62-70, (1985)
[20]
Swtnehart K.D., Blackstone J.H., Simulating a JIT/kanban production system using GEMS, Simulation, 57, pp. 262-269, (1991)