A SIMULATION GENERATOR FOR DUAL-CARD KANBAN-CONTROLLED FLOW SHOPS

被引:10
作者
CHRISTENSON, KR [1 ]
DOGAN, CA [1 ]
机构
[1] MICHIGAN TECHNOL UNIV,SCH BUSINESS & ENGN ADM,HOUGHTON,MI 49931
关键词
D O I
10.1080/00207549508904835
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper introduces a simulation generator for dual-card, kanban-controlled flow shops. Modelling kanban-controlled, pull manufacturing systems is a challenging task. The simulation generator eliminates modelling and the coding stages of simulation analysis and generates codes in SIMAN simulation language. An easy to use data-driven environment allows users to develop, edit, save and execute models without requiring any programming skills. The simulation generator is capable of simulating multi-product, multi-stage flow shops with multiple kanban cards (withdrawal and production order kanbans) and variable container sizes.
引用
收藏
页码:2615 / 2631
页数:17
相关论文
共 21 条
  • [1] Ahmud N.U., Tunc E.A., Montagno R.V., A comparative study of U.S. Manufacturing firms at various stages of just-in-time implementation, International Journal of Production Research, 29, pp. 787-902, (1991)
  • [2] Berkley B.J., A review of the kanban production control research literature, Production and Operations Management, (1993)
  • [3] Chu C.H., Shih W.L., Simulation studied in JIT production, International Journal of Production Research, 30, pp. 2573-2586, (1992)
  • [4] Golhar D., Stamm C.L., The just-in-timc philosophy, a literature review, International Journal of Production Research, 29, pp. 657-676, (1991)
  • [5] Haddock J., An expert system framework based on a simulation generator, Simulation, 48, pp. 45-53, (1987)
  • [6] Ketchum M.G., Watt J., Parametric simulation for flexible assembly systems, Journal of Manufacturing Systems, 8, pp. 115-124, (1989)
  • [7] Kung H.K., Changchit C., A just-in-time simulation model of a PCB assembly line, Computers and Industrial Engineering, 20, pp. 17-26, (1991)
  • [8] Mathewson S.C., The application of program generator software and its extensions to discrete event simulation modeling, IIE Transactions, 16, pp. 3-18, (1984)
  • [9] McKay K.N., Rooks M., Watmims JIT/Kanban Benchmark Summary and Recommendations, Proceedings of the 1989 Winter Simulation Conference, pp. 773-783, (1989)
  • [10] McClasn J.O., Thomas J.L., Mazzola J.B., Operations Management, Production of Goods and Services, (1992)