共 50 条
- [42] Two-instant reallocation in two-echelon spare parts inventory systems 2006 IEEE INTERNATIONAL CONFERENCE ON AUTOMATION SCIENCE AND ENGINEERING, VOLS 1 AND 2, 2006, : 342 - +
- [43] INVENTORY RISK BASED TECHNIQUE FOR SPARE PARTS UTILIZATION JURNAL TEKNOLOGI, 2015, 77 (05): : 79 - 84
- [45] A RISK BASED METHODOLOGY FOR SPARE PARTS INVENTORY OPTIMISATION IMECE 2008: SAFETY ENGINEERING, RISK ANALYSIS, AND RELIABILITY METHODS, VOL 16, 2009, : 215 - 223
- [47] Improving spare parts inventory control at a repair shop OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2015, 57 : 217 - 229
- [49] Research on the echelon inventory model of the repairable spare parts Binggong Xuebao/Acta Armamentarii, 2009, 30 (SUPPL. 1): : 90 - 94
- [50] Spare parts inventory control for the maintenance of productive plants IEEM: 2008 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-3, 2008, : 1380 - 1384