A probabilistic methodology for bridge deck condition assessment

被引:8
作者
Abu Dabous, S. [1 ]
Alkass, S. [1 ]
Zaki, A. [2 ]
机构
[1] Concordia Univ, Montreal, PQ, Canada
[2] SNC Lavalin Inc, Montreal, PQ, Canada
关键词
bridge; concrete; inspection; condition assessment; Monte Carlo; fuzzy; probabilistic;
D O I
10.1080/15732480801970473
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Condition assessment is an essential step in bridge management. Various techniques are currently used during the inspection of a bridge to assess the conditions of bridge elements. Data collected through inspection is used to make important decisions regarding needs assessment and budget allocation. However, inspection data is at best subjective and associated with uncertainty. This tends to create problems in the decision-making process. This paper presents a methodology tominimise the effect of such problems on the assessment of bridge decks condition. A bridge deck condition index is developed based on the remaining value of deteriorated quantities. A methodology is proposed that uses the fuzzy number concept and the Monte Carlo simulation technique to rate the deck condition taking into account the subjectivity and the uncertainty issues in the inspection process. The proposed methodology benefits from the bridge deck inspection's current practice. It produces a probabilistic rating that is consistent with the Markovian approach to model deterioration.
引用
收藏
页码:49 / 56
页数:8
相关论文
共 13 条
[1]   Ground-penetrating radar for network-level concrete deck repair management [J].
Barnes, CL ;
Trottier, JP .
JOURNAL OF TRANSPORTATION ENGINEERING-ASCE, 2000, 126 (03) :257-262
[2]  
Colorado Department of Transportation, 1995, BMS PONT BRIDG INSP
[3]   Updating Bridge Reliability Based on Bridge Management Systems Visual Inspection Results [J].
Estes, Allen C. ;
Frangopol, Dan M. .
JOURNAL OF BRIDGE ENGINEERING, 2003, 8 (06) :374-382
[4]  
FHWA, 1991, BRIDG INSP TRAIN MAN, V90
[5]   Pontis: A system for maintenance optimization and improvement of US bridge networks [J].
Golabi, K ;
Shepard, R .
INTERFACES, 1997, 27 (01) :71-88
[6]  
Hawk H, 1998, STRUCT ENG INT, V8, P309, DOI DOI 10.2749/101686698780488712
[7]  
Jiang Y., 1990, C36731 JOINT HIGHW R
[8]  
Jiang Y., 1988, 1180 TRANSP RES BOAR
[9]   Project-network analysis using fuzzy sets theory [J].
Lorterapong, P ;
Moselhi, O .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1996, 122 (04) :308-318
[10]  
Malhotra V., 2004, HDB NONDESTRUCTIVE T