The post-mining water balance

被引:1
作者
Eary, L. E. [1 ]
Watson, A. [2 ]
机构
[1] MWH Amer Inc, Suite 206,3665 JFK Pkwy, Ft Collins, CO 80525 USA
[2] MWH Amer Inc, Denver, CO 80202 USA
来源
TRANSACTIONS OF THE INSTITUTIONS OF MINING AND METALLURGY SECTION A-MINING TECHNOLOGY | 2009年 / 118卷 / 3-4期
关键词
D O I
10.1179/174328610X12682159815064
中图分类号
TD [矿业工程];
学科分类号
0819 ;
摘要
We tend to overestimate the volume of water used to process ore and the evaporation from tailings and heap leach stockpiles. During mine operation, a significant portion of the water collected from onsite water management systems is consumed and recycled by ore processing and lesser portion discharged to the environment. When mining and processing cease, however, the mine site water balance is altered and the real effort and cost associated with managing and disposing of excess mine-influenced water becomes evident. As these flows can no longer be recycled and may not be suitable for discharge to the environment, the cost of dealing with them can comprise a significant portion of the post-mining liability.
引用
收藏
页码:212 / 219
页数:8
相关论文
共 14 条
[1]  
Bingham E. L. J., 2001, SOC MIN ENG SME ANN
[2]   Gold production history of the United States [J].
Craig, JR ;
Rimstidt, JD .
ORE GEOLOGY REVIEWS, 1998, 13 (06) :407-464
[3]  
Davis A., 1997, MIN ENG-LITTLETON, V46, P98
[4]   Predicting the effects of evapoconcentration on water quality in mine pit lakes [J].
Eary, LE .
JOURNAL OF GEOCHEMICAL EXPLORATION, 1998, 64 (1-3) :223-236
[5]   Geochemical and equilibrium trends in mine pit lakes [J].
Eary, LE .
APPLIED GEOCHEMISTRY, 1999, 14 (08) :963-987
[6]   Revisiting the cumulative grade-tonnage relationship for major copper ore types [J].
Gerst, M. D. .
ECONOMIC GEOLOGY, 2008, 103 (03) :615-628
[7]  
Kelly T. D., 2008, US GEOLOGICAL SURVEY, V140
[8]  
Kump D., 2004, SOC MIN ENG ANN M SM
[9]  
Kunkel J. R., 2002, SOC MINI ENG SME ANN
[10]  
Michaelson S. D., 1960, MINING ENG, P674