A 7-YEAR PLAN FOR UPGRADING THE 200.000-PE TREATMENT-PLANT OF UPPSALA, SWEDEN

被引:0
作者
LIND, JE [1 ]
SWEDLING, EO [1 ]
机构
[1] UPPSALA GATUKONTOR, S-75106 UPPSALA, SWEDEN
关键词
TREATMENT PLANT RENEWAL; EFFLUENT QUALITY; OPERATING COSTS; COST-EFFICIENCY; NITROGEN REMOVAL; DENITRIFICATION; FULL SCALE EXPERIMENTS;
D O I
暂无
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The sewage treatment plant of Uppsala was originally built in 1946 and has since then been extended and upgraded several times up to 1972 when the last major upgrading was completed. In 1987 it was decided to renew the treatment plant for at least another 20-30 years of operation and to upgrade the biological process to include nitrogen reduction. A 7 year plan covering some 18 items with a total investment cost of approximately 120 MSEK was set in action during 1987. The aim was to raise the cost efficiency by introducing modern techniques, new machinery, a better working environment and a better understanding of the processes used. The need to keep the plant in operation during reconstruction work has caused difficulties, delays and unforseen costs but a close cooperation between all parties concerned (operators, contractors, engineers and the regional environment administration) has solved most of the problems. Experiences so far include an improved effluent quality, a better cost efficiency, a healthier and more engaged operating staff. A research team has been engaged to develop and introduce a nitrogen reduction scheme in the activated sludge process. This has been a challenging and fruitful experience.
引用
收藏
页码:117 / 127
页数:11
相关论文
共 4 条
[1]  
CARLSSON B, 1994, IN PRESS WAT SCI TEC, V30
[2]  
HALLIN S, 1994, IN PRESS WAT SCI TEC, V30
[3]  
XU S, 1993, IN PRESS EXPERIENCES
[4]  
1993, STAMP1991 1993 SUMM