AN INTERMEDIATE RESOURCE PLANNING METHODOLOGY

被引:1
作者
SAUL, GW
SADOWSKI, RP
机构
关键词
D O I
10.1016/0278-6125(86)90005-1
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
引用
收藏
页码:113 / 121
页数:9
相关论文
共 50 条
[41]   Flexible resource planning [J].
不详 .
MANUFACTURING ENGINEERING, 1999, 123 (02) :89-89
[42]   Enterprise resource planning [J].
Anon .
2001, Gardener Publications Inc. (74)
[43]   INTEGRATED RESOURCE PLANNING [J].
KREITH, F .
JOURNAL OF ENERGY RESOURCES TECHNOLOGY-TRANSACTIONS OF THE ASME, 1993, 115 (02) :80-85
[44]   Human resource planning [J].
Niknam, M .
WATER & ENERGY 2001 - NEEDS, DEVELOPMENT, UTILISATION: INTERNATIONAL R&D CONFERENCE, 1996, :575-585
[45]   TECHNOLOGICAL PLANNING FOR MANUFACTURE - METHODOLOGY OF PROCESS PLANNING [J].
SPUR, G ;
KRAUSE, FL ;
TUROWSKI, W .
LECTURE NOTES IN COMPUTER SCIENCE, 1984, 168 :53-59
[46]   Planning the enterprise resource [J].
Ferrar, A .
CONTROL AND INSTRUMENTATION, 2001, 33 (01) :16-17
[47]   Certifiable Resource Planning [J].
不详 .
MANUFACTURING ENGINEERING, 2023, 171 (05) :26-+
[48]   Enterprise resource planning [J].
Gulbrandsen, Tom W. .
International Paper Board Industry, 1999, 42 (11)
[49]   A conditional value-at-risk based methodology to intermediate-term planning of crude oil tanker fleet [J].
Siddiqui, Atiq W. ;
Verma, Manish .
COMPUTERS & INDUSTRIAL ENGINEERING, 2017, 113 :405-418
[50]   A resource generator methodology for hotels [J].
Revilla-Camacho, Maria-Angeles ;
Rey-Moreno, Manuel ;
Gallego, Angeles ;
Casanueva, Cristobal .
JOURNAL OF INNOVATION & KNOWLEDGE, 2019, 4 (02) :78-87