Adaptation of the value stream mapping approach to the design of lean engineer-to-order production systems A case study

被引:47
作者
Matt, D. T. [1 ]
机构
[1] Free Univ Bozen Bolzano, Fac Sci & Technol, Bolzano, Italy
关键词
Case study; Value stream mapping; Production systems; Engineer-to-order;
D O I
10.1108/JMTM-05-2012-0054
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose - The purpose of this research is to examine relevant parts of the case of an Italian steel construction company's green field plant design process to identify best practice guidelines for the adaptation and use of value stream mapping (VSM) in the design of lean engineer-to-order (ETO) production systems. Design/methodology/approach - The paper reviews the most relevant literature in the field of VSM and discusses its limitations regarding the application in an ETO environment. Based on the analysis of an industrial case, the original VSM methodology is adapted with a special focus on ETO. Information was collected through multiple site visits and semi-structured interviews with the company's key staff of the project, as well as examination of relevant company documentations. Findings - A set of guidelines was developed on the basis of an industrial case research. In this context, major attention was given to two aspects: the introduction of synchronization points in front of merge-activities in the value stream, and the splitting of customer orders into suitable production orders and equal time increments of work. Research limitations/implications - The findings of this research are limited due to the focused nature of a case study-based research. However, the obtained results encourage assuming its transferability to similar problems. Originality/value - This paper provides an original industrial case study with valuable insights for the adaptation of the VSM methodology to batch-of-one ETO environment.
引用
收藏
页码:334 / 350
页数:17
相关论文
共 51 条
  • [1] Analyzing the benefits of lean manufacturing and value stream mapping via simulation: A process sector case study
    Abdulmalek, Fawaz A.
    Rajgopal, Jayant
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2007, 107 (01) : 223 - 236
  • [2] Critical success factors for lean implementation within SMEs
    Achanga, Pius
    Shehab, Esam
    Roy, Rajkumar
    Nelder, Geoff
    [J]. JOURNAL OF MANUFACTURING TECHNOLOGY MANAGEMENT, 2006, 17 (04) : 460 - 471
  • [3] Business process modelling:: Review and framework
    Aguilar-Savén, RS
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2004, 90 (02) : 129 - 149
  • [4] Al-Sudairi A. A., 2007, CONSTRUCTION INNOVAT, V7, P99, DOI DOI 10.1108/14714170710721322
  • [5] Anand G., 2009, International Journal of Productivity and Quality Management, V4, P691, DOI 10.1504/IJPQM.2009.025192
  • [6] Value stream analysis of a re-engineered construction supply chain
    Arbulu, RJ
    Tommelein, ID
    Walsh, KD
    Hershauer, JC
    [J]. BUILDING RESEARCH AND INFORMATION, 2003, 31 (02) : 161 - 171
  • [7] A new value stream mapping approach for complex production systems
    Braglia, M.
    Carmignani, G.
    Zammori, F.
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2006, 44 (18-19) : 3929 - 3952
  • [8] Measuring parameters of lean manufacturing realization
    Chauhan, Gulshan
    Singh, T. P.
    [J]. MEASURING BUSINESS EXCELLENCE, 2012, 16 (03) : 57 - 71
  • [9] From value stream mapping toward a lean/sigma continuous improvement process: an industrial case study
    Chen, Joseph C.
    Li, Ye
    Shady, Brett D.
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2010, 48 (04) : 1069 - 1086
  • [10] Lean production: mistakes and limitations of accounting systems inside the SME sector
    Chiarini, Andrea
    [J]. JOURNAL OF MANUFACTURING TECHNOLOGY MANAGEMENT, 2012, 23 (05) : 681 - 700