CASE-STUDY ON THE INTEGRATION OF A NONUTILITY INDUCTION GENERATOR TO THE HYDRO-QUEBEC DISTRIBUTION NETWORK

被引:21
作者
BELHOMME, R
PLAMONDON, M
NAKRA, H
DESROSIERS, D
GAGNON, C
机构
[1] INST RECH HYDRO QUEBEC,DIV NETWORK PLANNING,DISTRIBUT GRP,MONTREAL,PQ H3C 4T8,CANADA
[2] INST RECH HYDRO QUEBEC,DEPT SYST ENGN,VARENNES,PQ J3X 1S1,CANADA
关键词
INDUCTION GENERATOR; SELF-EXCITATION; SYSTEM DISCONNECTION; DYNAMIC SIMULATION; DISTRIBUTION NETWORK; RELAY SETTINGS;
D O I
10.1109/61.400956
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This paper investigates the influence of different factors (such as load and capacitive compensation levels, load and turbine dynamic behaviors, machine parameters) on induction generator self-excitation phenomena and related overvoltages, resulting from a fault and/or an unwanted network disconnection. Simulations are performed on a 25 kV distribution network related to an actual project of integration of a nonutility induction generator to the Hydro-Quebec system. The paper presents the analysis of the results, as well as the derived guidelines for the determination of new relay settings and integration criteria for the Hydro-Quebec distribution network.
引用
收藏
页码:1677 / 1684
页数:8
相关论文
共 11 条