共 50 条
- [41] BURDEN PREPARATION AND BLAST-FURNACE OPERATION FOR THE MANUFACTURE OF LOW-SULFUR PIG-IRON STAHL UND EISEN, 1980, 100 (03): : 97 - 104
- [42] OPTIMUM PROPORTIONS OF PIG-IRON AND SLAG SEPARATING ARRANGEMENTS IN THE BLAST-FURNACE CAST HOUSE STEEL IN THE USSR, 1987, 17 (04): : 162 - 163
- [43] INVESTIGATING AND ADJUSTING OPERATING SCHEDULE OF HOT-BLAST STOVES ON A BLAST-FURNACE 2700 M3 IN VOLUME STEEL IN THE USSR, 1971, 1 (09): : 687 - &
- [44] INVESTIGATING INFLUENCE OF VARIOUS FACTORS ON SEPARATION OF PIG-IRON AND SLAG IN TROUGH DURING DISCHARGE FROM BLAST-FURNACE STEEL IN THE USSR, 1985, 15 (08): : 367 - 369
- [45] DETERMINING DYNAMIC CHARACTERISTICS OF 5000 M3 BLAST-FURNACE STEEL IN THE USSR, 1977, 7 (09): : 496 - 497
- [48] CERTAIN SPECIAL FEATURES OF MASS-EXCHANGE PROCESSES DURING PIG-IRON DESULFURIZATION WITH MAGNESIUM OUTSIDE BLAST-FURNACE STEEL IN THE USSR, 1976, 6 (04): : 175 - 176
- [49] INVESTIGATION OF SMELTING PROCESSES IN A BLAST-FURNACE 2000 M3 IN VOLUME STEEL IN THE USSR, 1973, 3 (04): : 263 - 267
- [50] OPERATION OF A BLAST-FURNACE 2000 M3 IN VOLUME ON SIZED MATERIALS STEEL IN THE USSR, 1972, 2 (01): : 6 - &