DEVELOPMENT OF GAS-TURBINE STEAM INJECTION WATER RECOVERY (SIWR) SYSTEM

被引:12
作者
NGUYEN, HB
DENOTTER, A
机构
[1] NOVA Corporation of Alberta, Edmonton, AB
来源
JOURNAL OF ENGINEERING FOR GAS TURBINES AND POWER-TRANSACTIONS OF THE ASME | 1994年 / 116卷 / 01期
关键词
D O I
10.1115/1.2906811
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
This paper describes and discusses a ''closed-loop'' steam injection water recovery (SIWR) cycle that was developed for steam-injected gas turbine applications. This process is needed to support gas turbine steam injection especially in areas where water cannot be wasted and complex water treatment is discouraged. The development of the SIWR was initiated by NOVA in an effort to reduce the environmental impact of operating gas turbines and to find suitable solutions for its expanding gas transmission system to meet future air emission restrictions. While turbine steam injection provides many benefits, it has not been considered for remote, less supported environments such as gas transmission applications due to its high wafer consumption. The SIWR process can alleviate this problem regardless of the amount of injection required. The paper also covers conceptual designs of a prototype SIWR system on a small gas turbine unit. However, because of relatively high costs, it is generally believed that the system is more attractive to larger size turbines and especially when it is used in conjunction with cogeneration or combined cycle applications.
引用
收藏
页码:68 / 74
页数:7
相关论文
共 11 条
[1]  
BELANGER R, 1990, BOILER WATER TREATME
[2]  
HEAPHY J, 1991, CONDENSING HEAT EXCH
[3]  
KELLER SC, 1987, AERODERIVATIVE GAS T
[4]  
KOLP DA, 1990, ASME90GT372 PAP
[5]  
NGUYEN HB, 1991, GAS TURBINE STEAM IN
[6]  
SAILER ED, 1989, NOX ABATEMENT STEAM
[7]  
SMITH KO, 1989, GAS TURBINE NOX EMIS
[8]  
THAMES JM, 1989, ASME89GT97 PAP
[9]  
1990, 19882005 ALB DEP EN
[10]  
1980, INVESTIGATION EFFECT