JUBILEE LINE EXTENSION

被引:2
作者
PAGE, DP
机构
来源
QUARTERLY JOURNAL OF ENGINEERING GEOLOGY | 1995年 / 28卷
关键词
D O I
10.1144/GSL.QJEGH.1995.028.P2.02
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
Describes the construction of London Underground's Jubilee Line Extension. Gives details of the geology along the proposed route and the construction methods for the shafts and tunnels that will penetrate it. It will be the first time that NATM has been used in central London and problems, such as archaeological relics and contaminated land during penetration of the man-made ground mantle, are highlighted. Details of support to be used, mainly compensation grouting, are given. Many of the stations to be built will be underground multi-propped excavations affording opportunity for close monitoring of the effects of construction. A study into the response of structures due to excavation induced subsidence is being carried out throughout the project. -S.E.Long
引用
收藏
页码:97 / 104
页数:8
相关论文
共 7 条
[1]  
Burland JB, 1979, DESIGN PARAMETERS GE, V1, P13
[2]  
Burland JB, 1977, STRUCT ENG, V55, P87
[3]  
DEANE A, 1992, WORLD TUNNELLING, V5, P242
[4]   LONDON DOCKLANDS - ENGINEERING GEOLOGY [J].
HOWLAND, AF .
PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 1-DESIGN AND CONSTRUCTION, 1991, 90 :1153-1178
[5]   CREATING A GEOLOGICAL DATABASE FOR PLANNING TUNNELS UNDER LONDON [J].
ROSENBAUM, MS ;
WARREN, CD .
QUARTERLY JOURNAL OF ENGINEERING GEOLOGY, 1986, 19 (04) :413-424
[6]   COMPUTER-MODEL FOR THE ANALYSIS OF GROUND MOVEMENTS IN LONDON CLAY [J].
SIMPSON, B ;
ORIORDAN, NJ ;
CROFT, DD .
GEOTECHNIQUE, 1979, 29 (02) :149-175
[7]   COMPARISONS BETWEEN REAL AND PREDICTED GEOLOGY IN TUNNELS - EXAMPLES FROM RECENT CASES [J].
WEST, G .
QUARTERLY JOURNAL OF ENGINEERING GEOLOGY, 1983, 16 (02) :113-126