共 20 条
[1]
Cox J.F., Black Stone J.H., Spencer M.S., (1992)
[2]
Fry T.D., Cox J.F., Blackstone J.H., An analysis and discussion of the OPT software and its use, Production and Operations Management Journal, 1, 2, pp. 229-242, (1992)
[3]
Fox R.E., Build your own OPT, American Production and Inventory Control Society 28Th Annual Conference Proceedings, pp. 568-572, (1985)
[4]
Goldratt E.M., Cox J., The Goal, (1986)
[5]
Goldratt E.M., Fox R.E., The Race, (1986)
[6]
Goldratt E.M., Computerized shop floor scheduling, I Nternat Ion Journal of Production Research, 26, 3, pp. 443-445, (1988)
[7]
Goldratt E.M., Fox R.E., Theory of Constraints Journal, 1, 2, pp. 16-20, (1988)
[8]
Goldratt E.M., Fox R.E., Theory of Constraints Journal, 1, 3, pp. 4-15, (1988)
[9]
Goldratt E.M., Fox R.E., Theory of Constraints Journal, 1, 6, pp. 18-23, (1990)
[10]
Jacobs F.R., TheOPT scheduling system: A review ofanew production schedulingsystem, Production and Inventory Management Journal, 24, 3, pp. 47-51, (1983)