MANIPULATING SUBJECTIVE EXPECTANCY THROUGH FEEDBACK - A LABORATORY STUDY OF THE EXPECTANCY-PERFORMANCE RELATIONSHIP

被引:14
作者
JANZ, T [1 ]
机构
[1] SIMON FRASER UNIV,SCH BUSINESS ADM,BURNABY V5A 1S6,BC,CANADA
关键词
D O I
10.1037/0021-9010.67.4.480
中图分类号
B849 [应用心理学];
学科分类号
040203 ;
摘要
引用
收藏
页码:480 / 485
页数:6
相关论文
共 8 条
  • [1] ARVEY RD, 1970, THESIS U MINNESOTA
  • [2] Atkinson J.W, 1964, INTRO MOTIVATION, DOI DOI 10.1007/s00431-012-1719-3
  • [3] Atkinson J. W., 1958, MOTIVES FANTASY ACTI
  • [4] Campbell J. P., 1976, HDB IND ORG PSYCHOL
  • [5] THEORY OF TASK MOTIVATION AND INCENTIVES
    LOCKE, EA
    [J]. ORGANIZATIONAL BEHAVIOR AND HUMAN PERFORMANCE, 1968, 3 (02): : 157 - 189
  • [6] MARYLAND VS MICHIGAN VS MINNESOTA - ANOTHER LOOK AT THE RELATIONSHIP OF EXPECTANCY AND GOAL DIFFICULTY TO TASK-PERFORMANCE
    MENTO, AJ
    CARTLEDGE, ND
    LOCKE, EA
    [J]. ORGANIZATIONAL BEHAVIOR AND HUMAN PERFORMANCE, 1980, 25 (03): : 419 - 440
  • [7] LABORATORY STUDY OF EFFECTS OF GOAL SPECIFICITY ON RELATIONSHIP BETWEEN PROBABILITY OF SUCCESS AND PERFORMANCE
    MOTOWIDLO, SJ
    LOEHR, V
    DUNNETTE, MD
    [J]. JOURNAL OF APPLIED PSYCHOLOGY, 1978, 63 (02) : 172 - 179
  • [8] Vroom V.H., 1964, WORK MOTIVATION