ON IMPROVING THE CONVERGENCE AND ACCURACY OF THE CUMULANT METHOD OF CALCULATING RELIABILITY AND PRODUCTION COST

被引:6
作者
DURAN, H
机构
关键词
D O I
10.1109/TPWRS.1986.4334965
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
引用
收藏
页码:121 / 126
页数:6
相关论文
共 21 条
[1]   EXPECTED ENERGY-PRODUCTION COST OF 2 INTERCONNECTED SYSTEMS WITH CORRELATED DEMANDS [J].
AHSAN, Q ;
SCHENK, KF ;
MISRA, RB .
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1983, 102 (07) :2155-2164
[2]  
ARVANITIDIS NV, 1970, SUM IEEE POW M
[3]  
Billington R., 1973, POWER SYSTEM RELIABI
[4]  
BILLINTON R, 1982, IEEE T PAS, V101, P995
[5]  
DURAN H, 1984, 1984 IEEE PES SUMM M
[6]   GENERATING-UNIT MAINTENANCE SCHEDULING FOR SINGLE AND 2 INTERCONNECTED SYSTEMS [J].
ELSHEIKHI, FA ;
BILLINTON, R .
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1984, 103 (05) :1038-1044
[7]  
Feller W., 2008, INTRO PROBABILITY TH
[8]   USE OF THE CUMULANT METHOD IN COMPUTING THE FREQUENCY AND DURATION INDEXES OF SINGLE AND 2 INTERCONNECTED SYSTEMS [J].
HAMOUD, G ;
NEUDORF, E .
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1983, 102 (08) :2391-2399
[9]  
KREYSZIG E, 1964, ADV ENG MATH
[10]   ACCURACY OF THE EDGEWORTH APPROXIMATION FOR LOLP CALCULATIONS IN SMALL POWER-SYSTEMS [J].
LEVY, DJ ;
KAHN, EP .
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1982, 101 (04) :986-996