COMPUTER-SIMULATION OF SEMISYNCHRONOUS START OF HYDROELECTRIC PUMPED-STORAGE UNITS

被引:2
|
作者
GONZALEZ, A [1 ]
BALDWIN, MS [1 ]
KILGORE, LA [1 ]
CHIDAMBER, SR [1 ]
机构
[1] UNIV PITTSBURGH,PITTSBURGH,PA 15261
来源
关键词
D O I
10.1109/TPAS.1983.317676
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
引用
收藏
页码:2702 / 2709
页数:8
相关论文
共 50 条
  • [31] INFLUENCE OF THE OPERATION OF A PUMPED-STORAGE HYDROELECTRIC POWER PLANT ON THE RESERVOIR'S THERMAL STRUCTURE
    Bermudez, Maria
    Cea, Luis
    Puertas, Jeronimo
    Rodriguez, Nuria
    Baztan, Javier
    PROCEEDINGS OF THE 36TH IAHR WORLD CONGRESS: DELTAS OF THE FUTURE AND WHAT HAPPENS UPSTREAM, 2015, : 4621 - 4629
  • [32] Coordination of Wind and Pumped-Storage Hydro Units for Managing Transmission Security
    Shahidehpour, Mohammad
    Khodayar, Mohammad
    2012 IEEE POWER AND ENERGY SOCIETY GENERAL MEETING, 2012,
  • [33] STARTING METHODS FOR GENERATOR/MOTOR UNITS EMPLOYED IN PUMPED-STORAGE STATIONS
    HAMMONS, TJ
    LOUGHRAN, J
    PROCEEDINGS OF THE INSTITUTION OF ELECTRICAL ENGINEERS-LONDON, 1970, 117 (09): : 1829 - &
  • [34] A reliability growth model for 300 MW pumped-storage power units
    Shi J.
    Yang Y.
    Deng Z.
    Frontiers of Energy and Power Engineering in China, 2009, 3 (3): : 337 - 340
  • [35] ELECTRONIC PROTECTION SYSTEM FOR HYDRAULIC AND MECHANICAL COMPONENTS OF PUMPED-STORAGE HYDROELECTRIC POWER-PLANTS
    HEIZINGER, J
    ELIN ZEITSCHRIFT, 1979, 31 (01): : 25 - 30
  • [37] PROBLEMS IN THE DEVELOPMENT OF LARGE HYDROELECTRIC GENERATOR-MOTORS FOR PUMPED-STORAGE POWER PLANTS.
    Gol'denberg, S.I.
    Loshkarev, V.P.
    Raskin, M.G.
    Shur, G.I.
    El'bert, E.S.
    Karymov, A.A.
    Brynskii, E.A.
    Soviet electrical engineering, 1984, 55 (06): : 18 - 22
  • [38] USE OF EQUALIZING RACKS IN THE OUTLET SECTIONS OF DRAFT TUBES OF HYDROELECTRIC AND PUMPED-STORAGE STATIONS.
    Mikhailov, I.E.
    Gubin, M.F.
    Kudrevatykh, V.G.
    Hydrotechnical Construction, 1984, 18 (07): : 308 - 312
  • [39] A linear programming method for the scheduling of pumped-storage units with oscillatory stability constraints
    Jeng, LH
    Hsu, YY
    Chang, BS
    Chen, KK
    IEEE TRANSACTIONS ON POWER SYSTEMS, 1996, 11 (04) : 1705 - 1710
  • [40] Transmission-constrained intrahour coordination of wind and pumped-storage hydro units
    Khodayar, Mohammad E.
    Abreu, Lisias
    Shahidehpour, Mohammad
    IET GENERATION TRANSMISSION & DISTRIBUTION, 2013, 7 (07) : 755 - 765