The time of groundwater free surface lowering before foundation pit construction

被引:2
|
作者
Girgidov, A. D. [1 ]
机构
[1] St Petersburg State Polytech Univ, St Petersburg, Russia
来源
MAGAZINE OF CIVIL ENGINEERING | 2012年 / 30卷 / 04期
关键词
groundwater; pit; free surface flow: lowering of free surface; group of wells; time of lowering;
D O I
10.5862/MCE.30.8
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
On the basis of plane free surface gravitations groundwater flow model and some assumptions similar to ones employing in infiltration and quasistationary problems the time of the necessary lowering of free surface before the building of pit is considered. For the lowering the group of wells along the pit perimeter is used. The wells are located so close to each other that formation a filtration flow by them is equivalent to dewatering by using a narrow vertical slit along the perimeter of the excavation. The time is calculated on the basis of condition that at the beginning of construction the level of ground water within the excavation must be below the design elevation of excavation bottom, and outside it smoothly changing water flow to the slit must be formed. The formulas for the time of lowering from initial natural level before building of pit to finite level equal to the bottom of pit are obtained. The example of calculation is discussed.
引用
收藏
页码:52 / +
页数:6
相关论文
共 50 条
  • [1] The technique of Deep Foundation Pit and Pile Foundation Construction
    Li, Rui
    Qiao, Yi
    Liu, Yongjie
    PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING, PTS. 1-5, 2012, 204-208 : 308 - 311
  • [2] Comprehensive Utilization of Foundation Pit Groundwater in Jinan
    Li, Shanping
    Wang, Hongbo
    Lian, Junfeng
    Zeng, Xueyuan
    Liu, Leclian
    2011 INTERNATIONAL CONFERENCE ON FUZZY SYSTEMS AND NEURAL COMPUTING (FSNC 2011), VOL V, 2011, : 62 - 65
  • [3] Comprehensive Utilization of Foundation Pit Groundwater in Jinan
    Li, Shanping
    Wang, Hongbo
    Lian, Junfeng
    Zeng, Xueyuan
    Liu, Leqian
    2011 AASRI CONFERENCE ON APPLIED INFORMATION TECHNOLOGY (AASRI-AIT 2011), VOL 3, 2011, : 62 - 65
  • [4] Design & Construction for a Deeper Foundation pit
    Li, Dongmei
    FRONTIERS OF GREEN BUILDING, MATERIALS AND CIVIL ENGINEERING, PTS 1-8, 2011, 71-78 : 1949 - 1953
  • [5] Research on Stability of Foundation Pit Construction
    Dai, Hengsan
    Yang, Tao
    ADVANCES IN CIVIL AND INDUSTRIAL ENGINEERING IV, 2014, 580-583 : 697 - +
  • [6] STUDY ON GROUNDWATER ENVIRONMENT AFFECTED BY FOUNDATION PIT DEWATERING IN SUBWAY OPEN-CUT CONSTRUCTION
    Xu, Mo
    Wei, Yunjie
    Cheng, Lu
    KEY TECHNOLOGIES OF RAILWAY ENGINEERING - HIGH SPEED RAILWAY, HEAVY HAUL RAILWAY AND URBAN RAIL TRANSIT, 2010, : 706 - 711
  • [7] Study Influence of Groundwater Seepage on the Deep Foundation Pit
    Gao, Hongmei
    Zhao, Yanlin
    Zhao, Jitao
    ADVANCES IN BUILDING MATERIALS, PTS 1-3, 2011, 168-170 : 2477 - 2480
  • [8] Feasibility Study on Lowering of Confined Water in a Foundation Pit Engineering
    Zhuang Qian
    Wang Guoguang
    Qi Zepeng
    ADVANCES IN ENVIRONMENTAL TECHNOLOGIES, PTS 1-6, 2013, 726-731 : 3052 - +
  • [9] Analysis of the behaviors of foundation pit with excavation considering variation of seepage free surface
    Department of Civil Engineering, Shanghai University, Shanghai 200072, China
    不详
    不详
    Tongji Daxue Xuebao/Journal of Tongji University, 2008, 36 (10): : 1327 - 1331
  • [10] Inverse Method: Deep Foundation Pit Construction
    Zhang, T.
    Pan, D.
    GEOTECHNICAL ENGINEERING, 2022, 53 (04): : 9 - 12