A simulation-enhanced lean design process

被引:60
作者
Marvel, Jon H. [1 ]
Standridge, Charles R. [2 ]
机构
[1] Gettysburg Coll, Gettysburg, PA 17325 USA
[2] Grand Valley State Univ, Allendale, MI USA
来源
JOURNAL OF INDUSTRIAL ENGINEERING AND MANAGEMENT-JIEM | 2009年 / 2卷 / 01期
关键词
lean manufacturing; simulation; process design;
D O I
10.3926/jiem.2009.v2n1.p90-113
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
A traditional lean transformation process does not validate the future state before implementation, relying instead on a series of iterations to modify the system until performance is satisfactory. An enhanced lean process that includes future state validation before implementation is presented. Simulation modeling and experimentation is proposed as the primary validation tool. Simulation modeling and experimentation extends value stream mapping to include time, the behavior of individual entities, structural variability, random variability, and component interaction effects. Experiments to analyze the model and draw conclusions about whether the lean transformation effectively addresses the current state gap can be conducted. Industrial applications of the enhanced lean process show it effectiveness.
引用
收藏
页码:90 / 113
页数:24
相关论文
共 51 条
[1]   Analyzing the benefits of lean manufacturing and value stream mapping via simulation: A process sector case study [J].
Abdulmalek, Fawaz A. ;
Rajgopal, Jayant .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2007, 107 (01) :223-236
[2]  
Adams M., 1999, P 1999 WINT SIM C 19
[3]   Lean viewed as a philosophy [J].
Bhasin, Sanjay ;
Burcher, Peter .
JOURNAL OF MANUFACTURING TECHNOLOGY MANAGEMENT, 2006, 17 (01) :56-+
[4]  
Byrne PJ, 2006, INT J IND ENG-THEORY, V13, P126
[5]   An Exploratory Analysis in Applying Lean Manufacturing to a Labor-Intensive Industry in China [J].
Comm, Clare L. ;
Mathaisel, Dennis F. X. .
ASIA PACIFIC JOURNAL OF MARKETING AND LOGISTICS, 2005, 17 (04) :63-80
[6]  
Conner G., 2007, MANUFACTURING ENG S, P27
[7]  
Davis D., 1999, RUNNING TODAYS FACTO
[8]   Quantifying benefits of conversion to lean manufacturing with discrete event simulation: a case study [J].
Detty, RB ;
Yingling, JC .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2000, 38 (02) :429-445
[9]  
Dhandapani V., 2004, INT J LOGISTICS RES, V7, P239
[10]  
Disney S. M., 1997, INT J PHYS DISTRIB, V27, P174, DOI DOI 10.1108/09600039710170566