Predicting geological hazards during tunnel construction

被引:52
作者
Li, Shucai [1 ]
Li, Shuchen [1 ]
Zhang, Qingsong [1 ]
Xue, Yiguo [1 ]
Liu, Bin [1 ]
Su, Maoxin [1 ]
Wang, Zhechao [1 ]
Wang, Shugang [1 ]
机构
[1] Shandong Univ, Geotech & Struct Engn Res Ctr, Jinan 250061, Shandong, Peoples R China
基金
中国国家自然科学基金;
关键词
tunnel projects; geological hazards; comprehensive prediction; tunnel seismic prediction (TSP); ground penetrating radar (GPR); transient electromagnetic method (TEM); analytic hierarchy process (AHP);
D O I
10.3724/SP.J.1235.2010.00232
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
The complicated geological conditions and geological hazards are challenging problems during tunnel construction, which will cause great losses of life and property. Therefore, reliable prediction of geological defective features, such as faults, karst caves and groundwater, has important practical significances and theoretical values. In this paper, we presented the criteria for detecting typical geological anomalies using the tunnel seismic prediction (TSP) method. The ground penetrating radar (GPR) signal response to water-bearing structures was used for theoretical derivations. And the 3D tomography of the transient electromagnetic method (TEM) was used to develop an equivalent conductance method. Based on the improvement of a single prediction technique, we developed a technical system for reliable prediction of geological defective features by analyzing the advantages and disadvantages of all prediction methods. The procedure of the application of this system was introduced in detail. For prediction, the selection of prediction methods is an important and challenging work. The analytic hierarchy process (AHP) was developed for prediction optimization. We applied the newly developed prediction system to several important projects in China, including Hurongxi highway, Jinping II hydropower station, and Kiaochow Bay subsea tunnel. The case studies show that the geological defective features can be successfully detected with good precision and efficiency, and the prediction system is proved to be an effective means to minimize the risks of geological hazards during tunnel construction.
引用
收藏
页码:232 / 242
页数:11
相关论文
共 13 条
  • [1] Di Qingyun, 2005, CHINESE J ROCK MECH, V24, P2631
  • [2] LI S., 2007, CHIN J ROCK MECH ENG, V26, P2
  • [3] [李术才 LI Shucai], 2008, [岩石力学与工程学报, Chinese Journal of Rock Mechanics and Engineering], V27, P1297
  • [4] Li Xiu, 2000, J XIAN ENG U, V22, P35
  • [5] Liu B, 2009, ROCK SOIL MECH, V30, P2191
  • [6] [刘志刚 Liu Zhigang], 2003, [岩石力学与工程学报, Chinese Journal of Rock Mechanics and Engineering], V22, P1399
  • [7] [曲海锋 Qu Haifeng], 2006, [岩石力学与工程学报, Chinese Journal of Rock Mechanics and Engineering], V25, P1246
  • [8] Rock mechanics and rock engineering in China: developments and current state-of-the-art
    Sun, J
    Wang, SJ
    [J]. INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES, 2000, 37 (03): : 447 - 465
  • [9] [王锦山 WANG Jinshan], 2007, [岩石力学与工程学报, Chinese Journal of Rock Mechanics and Engineering], V26, P2309
  • [10] Wang M., 2004, RAILR SURV, V30, P7