CUSTOMER INQUIRY MANAGEMENT - PART OF A HIERARCHICAL SYSTEM TO CONTROL LEAD TIMES IN MAKE-TO-ORDER COMPANIES

被引:22
|
作者
HENDRY, LC
KINGSMAN, BG
机构
[1] Department of Operational Research, Operations Management and University of Lancaster
关键词
BACKLOG LENGTHS; CUSTOMER INQUIRIES; MAKE-TO-ORDER MANUFACTURING; LEAD TIMES; HIERARCHICAL PRODUCTION CONTROL; INPUT OUTPUT CONTROL; DECISION SUPPORT SYSTEMS; PRODUCTION;
D O I
10.1057/jors.1993.7
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
The authors are currently developing a hierarchical production planning system specifically designed for the 'make-to-order' sector of industry. Its aim is to control the delivery and manufacturing lead times of all orders processed by a firm. Two major decision levels are identified -the customer enquiry stage and the order release stage. Input/output control is exercised at both stages. This paper is concerned with the control mechanisms used at the customer enquiry stage. Two important backlogs of work, along with their associated backlog lengths, are identified. The system aims to maintain these backlogs between predetermined minimum and maximum lengths in order to process all orders within an acceptable length of time. It is shown that the two backlogs are linked in a manner that enables them to be controlled simultaneously. Hence, a procedure for dealing with incoming customer orders is presented.
引用
收藏
页码:61 / 70
页数:10
相关论文
共 43 条
  • [1] JOB RELEASE - PART OF A HIERARCHICAL SYSTEM TO MANAGE MANUFACTURING LEAD TIMES IN MAKE-TO-ORDER COMPANIES
    HENDRY, LC
    KINGSMAN, BG
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1991, 42 (10) : 871 - 883
  • [2] Lean Control for Make-to-Order Companies: Integrating Customer Enquiry Management and Order Release
    Thuerer, Matthias
    Stevenson, Mark
    Silva, Cristovao
    Land, Martin J.
    Fredendall, Lawrence D.
    Melnyk, Steven A.
    PRODUCTION AND OPERATIONS MANAGEMENT, 2014, 23 (03) : 463 - 476
  • [3] A STRUCTURAL METHODOLOGY FOR MANAGING MANUFACTURING LEAD TIMES IN MAKE-TO-ORDER COMPANIES
    KINGSMAN, BG
    TATSIOPOULOS, IP
    HENDRY, LC
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1989, 40 (02) : 196 - 209
  • [4] Responding to customer enquiries in make-to-order companies: Problems and solutions
    Kingsman, B
    Hendry, L
    Mercer, A
    deSouza, A
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1996, 46 : 219 - 231
  • [5] A DECISION-SUPPORT SYSTEM FOR THE DYNAMIC PLANNING OF CUSTOMER ORDER INTAKE AND CAPACITY RESOURCES FOR MAKE-TO-ORDER COMPANIES
    KINGSMAN, B
    HENDRY, L
    WILSON, E
    IFIP TRANSACTIONS B-APPLICATIONS IN TECHNOLOGY, 1993, 13 : 133 - 141
  • [6] Setting planned lead times for a make-to-order production system with master schedule smoothing
    Teo, Chee-Chong
    Bhatnagar, Rohit
    Graves, Stephen C.
    IIE TRANSACTIONS, 2011, 43 (06) : 399 - 414
  • [7] Workload Control and Order Release: A Lean Solution for Make-to-Order Companies
    Thuerer, Matthias
    Stevenson', Mark
    Silva, Cristovao
    Land, Martin J.
    Fredendall, Lawrence D.
    PRODUCTION AND OPERATIONS MANAGEMENT, 2012, 21 (05) : 939 - 953
  • [8] Effect of workload control (WLC) on performance in make-to-order companies
    Hendry, L.C.
    Kingsman, B.G.
    Cheung, P.
    Journal of Operations Management, 1998, 16 (01): : 63 - 75
  • [9] A survey on shop floor control techniques in Polish make-to-order companies
    Wermus, M
    INTERNATIONAL JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT, 2001, 21 (11) : 1452 - 1459
  • [10] Planned lead time determination in a make-to-order remanufacturing system
    Tang, Ou
    Grubbstrom, Robert W.
    Zanoni, Simone
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2007, 108 (1-2) : 426 - 435