Energy-Saving and Punctuality Combined Velocity Planning for the Autonomous-Rail Rapid Tram with Enhanced Pseudospectral Method

被引:0
|
作者
Jinxiang Wang [1 ]
Dongming Han [1 ]
Yongjun Yan [1 ]
Neng Liu [1 ]
Ning Sun [2 ]
Guodong Yin [1 ]
机构
[1] School of Mechanical Engineering,Southeast University
[2] School of Automotive and Traffic Engineering,Nanjing Forestry University
基金
国家重点研发计划; 中国国家自然科学基金;
关键词
D O I
暂无
中图分类号
U239.5 [城市铁路、市郊铁路];
学科分类号
0814 ; 082301 ;
摘要
Autonomous-rail rapid transit(ART) is a new medium-capacity rapid transportation system with punctuality, comfort and convenience, but low-cost construction. Combined velocity planning is a critical approach to meet the requirements of energy-saving and punctuality. An ART velocity pre-planning and re-planning strategy based on the combination of punctuality dynamic programming(PDP) and pseudospectral(PS) method is proposed in this paper. Firstly, the longitudinal dynamics model of ART is established by a multi-particle model. Secondly, the PDP algorithm with global optimal characteristics is adopted as the pre-planning strategy. A model for determining the number of collocation points of the real-time PS method is proposed to improve the energy-saving effect while ensuring computation efficiency. Then the enhanced PS method is utilized to design the velocity re-planning strategy. Finally, simulations are conducted in the typical scenario with sloping roads, traffic lights, and intrusion of the pedestrian. The simulation results indicate that the ART with the proposed velocity trajectory optimization strategy can meet the punctuality requirement, and obtain better economy efficiency compared with the punctuality green light optimal speed advisory(PGLOSA).
引用
收藏
页码:317 / 329
页数:13
相关论文
共 4 条
  • [1] Energy-Saving and Punctuality Combined Velocity Planning for the Autonomous-Rail Rapid Tram with Enhanced Pseudospectral Method
    Jinxiang Wang
    Dongming Han
    Yongjun Yan
    Neng Liu
    Ning Sun
    Guodong Yin
    Chinese Journal of Mechanical Engineering, 36
  • [2] Energy-Saving and Punctuality Combined Velocity Planning for the Autonomous-Rail Rapid Tram with Enhanced Pseudospectral Method
    Wang, Jinxiang
    Han, Dongming
    Yan, Yongjun
    Liu, Neng
    Sun, Ning
    Yin, Guodong
    CHINESE JOURNAL OF MECHANICAL ENGINEERING, 2023, 36 (01)
  • [3] Velocity Trajectory Planning of the Autonomous-Rail Rapid Tram Considering Terrain and Traffic lights
    Wu, Mengyang
    Wang, Jinxiang
    Yan, Yongjun
    Yin, Guodong
    Ren, Zuping
    2020 IEEE 23RD INTERNATIONAL CONFERENCE ON INTELLIGENT TRANSPORTATION SYSTEMS (ITSC), 2020,
  • [4] Energy-Saving Planning Method for Autonomous Driving Mining Trucks Based on Composite Dynamic Sampling
    Ting C.
    Wang Y.
    Zhang Y.
    Wu M.
    Wang Y.
    Qiche Gongcheng/Automotive Engineering, 2024, 46 (04): : 588 - 595