Risk Assessment of Deep-Water Horizontal X-Tree Installation

被引:0
|
作者
MENG Wen-bo [1 ]
FU Guang-ming [2 ]
HUANG Yi [1 ]
LIU Shu-jie [1 ]
HUANG Liang [1 ]
GAO Yong-hai [2 ]
机构
[1] CNOOC China Limited, Zhanjiang Branch
[2] Key Laboratory of Unconventional Oil and Gas Development, Ministry of Education (China University of Petroleum (East China))
关键词
D O I
暂无
中图分类号
TE95 [海上油气田开发开采机械设备];
学科分类号
082002 ;
摘要
Due to the high potential risk and many influencing factors of subsea horizontal X-tree installation, to guarantee the successful completion of sea trials of domestic subsea horizontal X-trees, this paper established a modular risk evaluation model based on a fuzzy fault tree. First, through the analysis of the main process oftree down and combining the Offshore & Onshore Reliability Data(OREDA) failure statistics and the operation procedure and the data provided by the job, the fault tree model of risk analysis of the tree down installation was established. Then, by introducing the natural language of expert comprehensive evaluation and combining fuzzy principles, quantitative analysis was carried out, and the fuzzy number was used to calculate the failure probability of a basic event and the occurrence probability of a top event. Finally, through a sensitivity analysis of basic events, the basic events of top events significantly affected were determined, and risk control and prevention measures for the corresponding high-risk factors were proposed for subsea horizontal X-tree down installation.
引用
收藏
页码:210 / 220
页数:11
相关论文
共 50 条
  • [1] Risk Assessment of Deep-Water Horizontal X-Tree Installation
    Meng, Wen-bo
    Fu, Guang-ming
    Huang, Yi
    Liu, Shu-jie
    Huang, Liang
    Gao, Yong-hai
    CHINA OCEAN ENGINEERING, 2024, 38 (02) : 210 - 220
  • [2] INSTALLATION OF PIPELINES IN DEEP-WATER
    LOCHRIDGE, JC
    ERDOL & KOHLE ERDGAS PETROCHEMIE, 1979, 32 (10): : 478 - 484
  • [3] Risk assessment of surface conductor jetting installation during deep-water drilling in sloping seabed
    Zhao, Xin
    Yin, Qishuai
    Yang, Jin
    Long, Yang
    Liu, Hexing
    Guo, Yingying
    OCEAN ENGINEERING, 2022, 266
  • [4] INSTALLATION OF FIXED PLATFORMS IN DEEP-WATER
    HEEREMA, PS
    JONG, RPD
    JOURNAL OF PETROLEUM TECHNOLOGY, 1975, 27 (FEB): : 193 - 193
  • [5] INSTALLATION OF A DEEP-WATER, SUBSEA COMPLETION SYSTEM
    STONE, WH
    JOURNAL OF PETROLEUM TECHNOLOGY, 1978, 30 (OCT): : 1392 - 1402
  • [6] THE DESIGN AND INSTALLATION OF EFFICIENT DEEP-WATER PERMANENT MOORINGS
    DSOUZA, R
    DOVE, PGS
    HERVEY, DG
    HARDIN, DJ
    MARINE TECHNOLOGY AND SNAME NEWS, 1992, 29 (01): : 25 - 35
  • [7] Risk Mitigation of Chemical Munitions in a Deep-Water Geohazard Assessment
    Herbert, John
    MARINE TECHNOLOGY SOCIETY JOURNAL, 2010, 44 (01) : 86 - 96
  • [8] An active truncation method for simulating deep-water riser installation
    Ye, Mao
    Duan, Menglan
    Li, Mingjie
    Chen, Jinghao
    Tian, Kai
    Han, Feng
    Hu, Zhihui
    SHIPS AND OFFSHORE STRUCTURES, 2014, 9 (06) : 619 - 632
  • [9] Research and Application of Deep-water Anchor Pile Installation Technology
    Wang, Zhifeng
    Yang, Xuezheng
    Qiu, Haowei
    Gao, Chao
    He, Folin
    Ship Building of China, 2022, 63 (04) : 207 - 216
  • [10] ANALYSIS OF THE HORIZONTAL TO VERTICAL ORIENTATION OF DEEP-WATER RISERS
    HEALEY, AJ
    FLORES, A
    JOURNAL OF ENERGY RESOURCES TECHNOLOGY-TRANSACTIONS OF THE ASME, 1981, 103 (01): : 106 - 108