共 50 条
- [1] Method to Predict the Reasonable Injection Adjustment at the Later Stage of Waterflooding Oilfield with High Water-cut 2010 ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE (APPEEC), 2010,
- [2] The Research on the Injection Interval's Reasonable Water Injection Rate for Multi-Layer Sandstone Oilfield at Ultra-High Water Cut Stage PROCEEDINGS OF THE 5TH INTERNATIONAL CONFERENCE ON ADVANCED DESIGN AND MANUFACTURING ENGINEERING, 2015, 39 : 583 - 588
- [4] Calculation Method of Water Injection Forward Modeling and Inversion Process in Oilfield Water Injection Network ADVANCES IN MATERIALS, MACHINERY, ELECTRONICS II, 2018, 1955
- [5] Numerical Simulation Research on Reasonable Production Time Limit Optimization of Advanced Water Injection in Low Permeability Oilfield INFORMATION TECHNOLOGY APPLICATIONS IN INDUSTRY II, PTS 1-4, 2013, 411-414 : 3121 - +
- [7] Reasonable water injection rate calculation for water flooding reservoirs at different water-cut stages Shiyou Kan Tan Yu Kai Fa/Petroleum Exploration and Development, 25 (03): : 69 - 71
- [9] Identification and predictions of water injectivity for water injection channels in water injection development oilfield Shiyou Xuebao/Acta Petrolei Sinica, 2021, 42 (08): : 1081 - 1090