共 95 条
- [1] Fattahi P(2009)Flexible job shop scheduling with overlapping in operations Appl Math Model 33 3076-3087
- [2] Jolai F(1976)The complexity of flow shop and job shop scheduling Math Oper Res 1 117-129
- [3] Arkat J(2007)Mathematical modeling and heuristic approaches to flexible job shop scheduling problems J Intell Manuf 18 331-342
- [4] Garey MR(2005)An effective hybrid optimization approach for multi-objective flexible job-shop scheduling problems Comput Ind Eng 48 409-425
- [5] Johnson DS(2011)Robust and stable flexible job shop scheduling with random machine breakdowns using a hybrid genetic algorithm Int J Prod Econ 132 279-291
- [6] Sethi R(1990)Job-shop scheduling with multi-purpose machines Computing 45 369-375
- [7] Fattahi P(2006)An algorithm for multi objective job shop scheduling problem J Ind Eng Int 2 43-53
- [8] SaidiMehrabad M(2002)A fast and elitist multi-objective genetic algorithm: NSGAII IEEE Trans Evol Comput 6 182-197
- [9] Jolai F(2007)A hybrid of genetic algorithm and bottleneck shifting for multiobjective flexible job shop scheduling problems Comput Ind Eng 53 149-162
- [10] Xia W(2012)Two meta-heuristic algorithms for solving multi objective flexible job shop scheduling with parallel machine and maintenance constraints Comput Math Appl 64 211-2117