A hybrid multi-objective genetic algorithm based on the ELECTRE method for a capacitated flexible job shop scheduling problem

被引:1
作者
Mohamad Rohaninejad
Amirsaman Kheirkhah
Parviz Fattahi
Behdin Vahedi-Nouri
机构
[1] Bu-Ali Sina University,Department of Industrial Engineering
来源
The International Journal of Advanced Manufacturing Technology | 2015年 / 77卷
关键词
Scheduling; Flexible job shop; Multi-objective genetic algorithm; ELECTRE method; Pareto optimal front;
D O I
暂无
中图分类号
学科分类号
摘要
In this paper, a multi-objective flexible job shop scheduling problem with machines capacity constraints is studied. Minimizing the makespan and overtime costs of machines are considered as two objectives for evaluating solutions. First, a new nonlinear integer programming model is presented to formulate the problem. Inasmuch as this problem is well-known as a NP-hard problem, a hybrid meta-heuristic algorithm (CFJSP II) is developed to overcome its complexity. Regarding to the solution space of the problem, for assigning and sequencing operations, a multi-objective genetic algorithm based on the ELECTRE method is presented. Also, a powerful heuristic approach to tradeoff the objective functions is developed. Finally, the proposed algorithm is compared with some well-known multi-objective algorithms such as NSGAII, SPEA2, and VEGA. Regarding to the computational results, it is clear that the proposed algorithm has a better performance especially in the closeness of the solutions to the Pareto optimal front.
引用
收藏
页码:51 / 66
页数:15
相关论文
共 95 条
  • [1] Fattahi P(2009)Flexible job shop scheduling with overlapping in operations Appl Math Model 33 3076-3087
  • [2] Jolai F(1976)The complexity of flow shop and job shop scheduling Math Oper Res 1 117-129
  • [3] Arkat J(2007)Mathematical modeling and heuristic approaches to flexible job shop scheduling problems J Intell Manuf 18 331-342
  • [4] Garey MR(2005)An effective hybrid optimization approach for multi-objective flexible job-shop scheduling problems Comput Ind Eng 48 409-425
  • [5] Johnson DS(2011)Robust and stable flexible job shop scheduling with random machine breakdowns using a hybrid genetic algorithm Int J Prod Econ 132 279-291
  • [6] Sethi R(1990)Job-shop scheduling with multi-purpose machines Computing 45 369-375
  • [7] Fattahi P(2006)An algorithm for multi objective job shop scheduling problem J Ind Eng Int 2 43-53
  • [8] SaidiMehrabad M(2002)A fast and elitist multi-objective genetic algorithm: NSGAII IEEE Trans Evol Comput 6 182-197
  • [9] Jolai F(2007)A hybrid of genetic algorithm and bottleneck shifting for multiobjective flexible job shop scheduling problems Comput Ind Eng 53 149-162
  • [10] Xia W(2012)Two meta-heuristic algorithms for solving multi objective flexible job shop scheduling with parallel machine and maintenance constraints Comput Math Appl 64 211-2117