Validation of horizontal auger drilling string assembly design based on dry bearings

被引:0
作者
L. E. Mamet’ev
O. V. Lyubimov
Yu. V. Drozdenko
机构
[1] Gorbachev State Technical University,
来源
Journal of Mining Science | 2017年 / 53卷
关键词
Drilling; removal; drilling string assembly; rounder; centering device; antifriction bearing; filler; lubrication; sealing;
D O I
暂无
中图分类号
学科分类号
摘要
The authors identify some factors that govern energy input of borings removal from hole bottom to an unloading point using auger drilling string assembly. Of specific significance appears to be the factor of insufficient reliability of anchor gears and centering devices of the drilling string assembly, which makes continuous drilling impossible without permanent servicing. The article gives the analysis of bench testing data of bearings with antifriction filler for drilling string mounting groups to be serviced outside the areas of drill holes. The design solutions based on the investigation results and aimed to improve reliability of anchor gears and centering devices of an auger drilling string assembly are described.
引用
收藏
页码:275 / 281
页数:6
相关论文
共 25 条
  • [1] Petreev A.M.(1999)Improving the Efficiency of Soil Intake Device J. min. Sci. 35 59-64
  • [2] Gileta V.P.(2010)“Underground Rocket” Design Principles J. Min. Sci. 46 536-545
  • [3] Smolyanitsky B.N.(2015)Stress Distribution in Attachments of Disc Cutters in Heading Drivage J. Min. Sci. 51 1150-1156
  • [4] Oparin V.N.(2015)The Distribution of Stresses and Strains in the Mating Elements Disk Tools Working Bodies of Roadheaders IOP Conference Series: Materials Science and Engineering 91 012084-486
  • [5] Danilov B.B.(2012)Experimental Substantiation of Broken Soil Transportation in Horizontal Borehole Drilling J. Min. Sci. 48 480-490
  • [6] Smolyanitsky B.N.(2014)Determination of Conditions for Compressed Air-Assisted Removal of Plastic Soil in Horizontal Pipeline in Drilling J. Min. Sci. 50 484-25
  • [7] Mamet’ev L.E.(2011)Validation of Transport Competence of Horizontal Auger Drilling Column GIAB 5 22-217
  • [8] Khoreshok A.A.(2012)Auger Drilling in Mining and Underground Construction GIAB 2 211-undefined
  • [9] Tsekhin A.M.(undefined)undefined undefined undefined undefined-undefined
  • [10] Borisov A.Yu.(undefined)undefined undefined undefined undefined-undefined