共 16 条
[1]
Lad B.K., Kulkarni M.S., Optimal maintenance schedule decisions for machine tools considering the user’s cost structure, Int. J. Prod. Res., 50, 2, pp. 5859-5871, (2012)
[2]
Lad B.K., Kulkarni M.S., Integrated reliability and optimal maintenance schedule design: a life cycle cast based approach, Int. J. Prod. Lifecycle Manag., 3, 1, pp. 78-90, (2008)
[3]
Rausand M., Reliability centered maintenance, J. Reliab. Eng. Syst. Saf., 60, pp. 121-132, (1998)
[4]
Qingbin Y., Qingfeng W., Jinji G., The research on risk and cbm decision making and task optimizing system, Int. J. Reliab. Qual. Saf. Eng., 10, 4, pp. 1250017-1250037, (2012)
[5]
Eisinger S., Rakowsky U.K., Modelingof uncertainties in reliability centered maintenance—a probabilistic approach, J. Reliab. Eng. Syst. Saf., 71, pp. 159-164, (2001)
[6]
Hauge B.S., D.C, (2001)
[7]
Pexa M., T. Hladik, 5, (2013)
[8]
Selvik J.T., Aven T., A framework for reliability and risk centered maintenance, J. Reliab. Eng. Syst. Saf., 96, pp. 324-333, (2011)
[9]
Aven T., On how to define, understand and describe risk, Reliab. Eng. Syst. Saf., 95, pp. 623-631, (2010)
[10]
Fonseca D.J., Knapp G.M., An expert system for reliability centered maintenance in the chemical industry, Exp. Syst. Appl., 19, pp. 45-57, (2000)