Variable neighborhood search algorithms for the permutation flowshop scheduling problem with the preventive maintenance

被引:0
作者
Wahiba Jomaa
Mansour Eddaly
Bassem Jarboui
机构
[1] Université de Sfax,MODILS Laboratory, FSEGS
[2] Qassim University,College of Business and Economics
[3] Université de Gafsa,ISAEG
[4] Higher Colleges of Technology,undefined
来源
Operational Research | 2021年 / 21卷
关键词
Permutation flowshop; Preventive maintenance; Variable neighborhood search; Makespan; 90B25; 90B35; 68W40;
D O I
暂无
中图分类号
学科分类号
摘要
This paper addresses to the permutation flowshop scheduling problem while considering the preventive maintenance in the non-resumable case. The criterion to be optimized is the makespan. Two variable neighborhood search algorithms are proposed. In the first algorithm, only one initial solution is generated according to a constructive heuristic. In the second algorithm, a learning process using a probabilistic model is introduced to the variable neighborhood algorithm in order to generate the initial solution. The computational results show the high performance of the proposed algorithms according to the compared approaches. Besides, the change of the initial solution during the optimization procedure may improve the performance of the variable neighborhood search algorithm.
引用
收藏
页码:2525 / 2542
页数:17
相关论文
共 50 条
[31]   Game Theoretic Modelling of the Integrated Production and Preventive Maintenance Scheduling Problem in Permutation Flowshops [J].
Tayeb, Fatima Benbouzid-Si ;
Messiaid, Abdessalam ;
Benatchba, Karima .
2015 54TH IEEE CONFERENCE ON DECISION AND CONTROL (CDC), 2015, :5184-5189
[32]   A hybrid variable neighborhood search algorithm for solving the limited-buffer permutation flow shop scheduling problem with the makespan criterion [J].
Moslehi, Ghasem ;
Khorasanian, Danial .
COMPUTERS & OPERATIONS RESEARCH, 2014, 52 :260-268
[33]   An Integrated ACO Approach for the Joint Production and Preventive Maintenance Scheduling Problem in the Flowshop Sequencing Problem [J].
Benbouzid-Sitayeb, Fatima ;
Ammi, Ismail ;
Varnier, Christophe ;
Zerhouni, Noureddine .
2008 IEEE INTERNATIONAL SYMPOSIUM ON INDUSTRIAL ELECTRONICS, VOLS 1-5, 2008, :1541-+
[34]   Game theory-based integration of scheduling with flexible and periodic maintenance planning in the permutation flowshop sequencing problem [J].
Benbouzid-Si Tayeb, Fatima ;
Benatchba, Karima ;
Messiaid, Abd-Essalam .
OPERATIONAL RESEARCH, 2018, 18 (01) :221-255
[35]   Survey on Distributed Assembly Permutation Flowshop Scheduling Problem [J].
Zhang, Jing ;
Song, Hongbo ;
Lin, Jian .
Computer Engineering and Applications, 2024, 60 (06) :1-9
[36]   An energy-efficient permutation flowshop scheduling problem [J].
Oztop, Hande ;
Tasgetiren, M. Fatih ;
Eliiyi, Deniz Tursel ;
Pan, Quan-Ke ;
Kandiller, Levent .
EXPERT SYSTEMS WITH APPLICATIONS, 2020, 150
[37]   Towards an Artificial Immune System for Scheduling Jobs and Preventive Maintenance Operations in Flowshop Problems [J].
Tayeb, Fatima Benbouzid-Si ;
Belkaaloul, Wahiba .
2014 IEEE 23RD INTERNATIONAL SYMPOSIUM ON INDUSTRIAL ELECTRONICS (ISIE), 2014, :1065-1070
[38]   A Hybrid Algorithm for the Permutation Flowshop Scheduling Problem without Intermediate Buffers [J].
Liu, Xiaobo ;
Li, Kun ;
Ren, Huizhi .
DISCRETE DYNAMICS IN NATURE AND SOCIETY, 2015, 2015
[39]   Efficient procedures for the weighted squared tardiness permutation flowshop scheduling problem [J].
Costa, Maria Raquel C. ;
Valente, Jorge M. S. ;
Schaller, Jeffrey E. .
FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, 2020, 32 (03) :487-522
[40]   New simple constructive heuristic algorithms for minimizing total flow-time in the permutation flowshop scheduling problem [J].
Abedinnia, Hamid ;
Glock, Christoph H. ;
Brill, Andreas .
COMPUTERS & OPERATIONS RESEARCH, 2016, 74 :165-174