Lunar cycle inspired PSO for single machine total weighted tardiness scheduling problem

被引:0
作者
Shruti Gupta
Rajani Kumari
Rishi Pal Singh
机构
[1] Career Point University,
[2] JECRC University,undefined
[3] Guru Jambheshwar University of Science and Technology,undefined
来源
Evolutionary Intelligence | 2021年 / 14卷
关键词
Scheduling problem; Lunar cycle; Combinatorial optimization; Particle swarm optimization;
D O I
暂无
中图分类号
学科分类号
摘要
In the large scale Single machine total weighted tardiness scheduling problem (SMTWTSP) is a group of not-interrelated tasks having different parameters to be executed on one machine. The problem’s objective is to identify the minimum total weighted tardiness using a newly developed variant of the particle swarm optimization (PSO) algorithm. In the past, the PSO algorithm has proved itself as an efficient swarm intelligence based strategy to solve complex combinatorial problems. Here, in this article, the lunar cycle inspired local search technique is assimilated into PSO, and the designed PSO variant is termed as lunar cycle inspired PSO (LCPSO). The performance of the designed LCPSO is tested over 25 large SMTWTSP instances of job size 1000. The reported results show that the designed LCPSO is a competitive PSO variant that can be applied to provide an effective solution for the SMTWTSP type combinatorial optimization problem.
引用
收藏
页码:1355 / 1366
页数:11
相关论文
共 103 条
  • [1] Jain S(2020)Modified differential evolution algorithm for solving minimum spanning tree J Inf Optim Sci 41 633-639
  • [2] Kumar S(2013)Enhanced artificial bee colony algorithm and its application to travelling salesman problem Int J Technol Innov Res 2 1-10
  • [3] Sharma VK(2020)Modified local link failure recovery multicast routing protocol for MANET J Inf Optim Sci 41 669-677
  • [4] Poonia RC(2020)Peregrine preying pattern based differential evolution for robot path planning J Interdiscip Math 23 555-562
  • [5] Lamba NP(2014)A novel hybrid algorithm for permutation flow shop scheduling Int J Comput Sci Inf Technol 5 5057-5061
  • [6] Pandey S(2014)Fuzzified job shop scheduling algorithm Int J Technol Innov Res 7 1-20
  • [7] Kumar S(2020)Proficient QoS-based target coverage problem in wireless sensor networks IEEE Access 8 74315-74325
  • [8] Goyal A(1977)Complexity of machine scheduling problems Ann Discret Math 1 343-362
  • [9] Sharma VK(1978)Dynamic programming solution of sequencing problems with precedence constraints Oper Res 26 444-449
  • [10] Kumar S(1985)A branch and bound algorithm for the total weighted tardiness problem Oper Res 33 363-377